X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324271707000

Well Details

Well ID: 0324271707000
Loading map...
Location: 00/07-17-032-27W4/0
Location Alias: 00/07-17-32-27 W4M
Location Alias 2: 00/07-17-032-27 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 27
Section: 17
County/Municipality: Mountain View County
Well Name: EMBER STEWART 7-17-32-27
Operator Name: Ember Resources Inc.
License Number: 0156850
License Date: 1993-02-26
License Status: Issued
Spud Date: 1993-02-27
Final Drill Date: 1993-03-07
Well Total Depth: 1800.00 m
Surface Hole Latitude: 51.742463
Surface Hole Longitude: -113.794077

For data sources see[1][2]

Well History

Date Event
1993-02-26 Obtained License
1993-02-27 Surface Casing Operation Performed
1993-03-07 Finished Drilling
1993-03-07 Well Log Performed
1993-03-07 Well Mode changed to Drilled and Cased
1993-03-09 Production Casing Operation Performed
1993-03-09 Rig Released
1993-05-02 Perforation Treatment Performed - Jet Perforation
1993-05-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-05-11 Perforation Treatment Performed - Jet Perforation
1993-05-11 Plug Back Performed
1993-06-20 Perforation Treatment Performed - Fractured
1993-09-02 Well Began Production
1993-09-02 Well Fluid changed to Gas
1993-09-02 Well Mode changed to Flowing
2001-01-01 Well Fluid changed to Gas
2001-01-01 Well Mode changed to Pumping
2004-09-30 Perforation Treatment Performed - Jet Perforation
2004-09-30 Well Log Performed
2004-10-03 Perforation Treatment Performed - Fractured
2006-06-12 Well Log Performed
2020-03-05 Well Fluid changed to Gas
2020-03-05 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-05-02 Perforation 1761.00 1763.50 13
1993-05-11 Packing Device Capped w/Cement 1755.00 1758.00 0
1993-05-11 Perforation 1736.50 1738.50 20
1993-06-20 Fracture 1736.50 1738.50 0
2004-09-30 Perforation 1139.00 1142.00 13
2004-09-30 Perforation 1144.00 1146.00 13
2004-10-03 Fracture 1139.00 1146.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 2856 0.0 0.0 0.0
1994 8609 0.0 0.0 0.0
1995 8732 0.0 0.0 0.0
1996 8772 0.0 0.0 0.0
1997 8735 0.0 0.0 0.0
1998 8730 0.0 0.0 0.0
1999 8684 0.0 0.0 0.0
2000 8586 0.0 0.0 0.0
2001 8199 0.0 0.0 0.0
2002 6525 0.0 0.0 0.0
2003 8735 0.0 0.0 0.0
2004 7706 0.0 0.0 0.0
2005 6793 0.0 0.0 0.0
2006 5021 0.0 0.0 0.0
2007 8347 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8733 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8745 0.0 0.0 0.0
2013 8679 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8687 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 3007 0.0 0.0 0.0
2020 742 0.0 0.0 0.0

For data sources see[5]

References