X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324212306000

Well Details

Well ID: 0324212306000
Loading map...
Location: 00/06-23-032-21W4/0
Location Alias: 00/06-23-32-21 W4M
Location Alias 2: 00/06-23-032-21 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 21
Section: 23
County/Municipality: Starland County
Well Name: PNR ENER ET AL ROWLEY 6-23-32-21
Operator Name: TAQA North Ltd.
License Number: 0330517
License Date: 2005-05-06
License Status: Amended
Spud Date: 2005-08-07
Final Drill Date: 2005-08-09
Well Total Depth: 693.00 m
Surface Hole Latitude: 51.757690
Surface Hole Longitude: -112.878945

For data sources see[1][2]

Well History

Date Event
2005-05-06 Obtained License
2005-08-07 Surface Casing Operation Performed
2005-08-09 Finished Drilling
2005-08-09 Production Casing Operation Performed
2005-08-09 Rig Released
2005-08-09 Well Mode changed to Drilled and Cased
2005-09-21 Well Log Performed
2006-03-17 Perforation Treatment Performed - Jet Perforation
2006-04-26 Well Log Performed
2006-06-01 Well Began Production
2006-06-01 Well Fluid changed to Coalbed Methane-Coals and Other
2006-06-01 Well Mode changed to Flowing
2019-01-01 Well Fluid changed to Coalbed Methane-Coals and Other
2019-01-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-03-17 Perforation 178.00 178.50 14
2006-03-17 Perforation 287.20 288.20 14
2006-03-17 Perforation 292.50 293.50 14
2006-03-17 Perforation 353.00 353.50 14
2006-03-17 Perforation 354.00 355.00 14
2006-03-17 Perforation 359.50 360.50 14
2006-03-17 Perforation 361.00 362.00 14
2006-03-17 Perforation 374.50 375.50 14
2006-03-17 Perforation 377.50 378.50 14
2006-03-17 Perforation 405.00 405.50 14
2006-03-17 Perforation 406.50 407.50 14
2006-03-17 Perforation 179.00 183.00 14
2006-03-17 Perforation 410.20 411.20 14
2006-03-17 Perforation 417.00 418.00 14
2006-03-17 Perforation 468.00 469.00 14
2006-03-17 Perforation 518.00 518.50 14
2006-03-17 Perforation 521.00 521.50 14
2006-03-17 Perforation 522.00 525.00 14
2006-03-17 Perforation 528.50 529.50 14
2006-03-17 Perforation 534.00 534.50 14
2006-03-17 Perforation 535.00 538.00 14
2006-03-17 Perforation 621.50 623.50 14
2006-03-17 Perforation 188.80 189.80 14
2006-03-17 Perforation 238.50 239.00 14
2006-03-17 Perforation 240.20 242.20 14
2006-03-17 Perforation 244.30 245.30 14
2006-03-17 Perforation 255.80 256.30 14
2006-03-17 Perforation 260.60 261.60 14
2006-03-17 Perforation 274.60 276.60 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 3686 0.0 0.0 0.0
2007 7974 0.0 0.0 0.0
2008 8504 0.0 0.0 0.0
2009 8319 0.0 0.0 0.0
2010 8309 0.0 0.0 0.0
2011 8191 0.0 0.0 0.0
2012 8395 0.0 0.0 0.0
2013 8668 0.0 0.0 0.0
2014 8588 0.0 0.0 0.0
2015 8603 0.0 0.0 0.0
2016 8615 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 7463 0.0 0.0 0.0

For data sources see[5]

References