X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324023204020

Well Details

Well ID: 0324023204020
Loading map...
Location: 02/04-32-032-02W4/0
Location Alias: 02/04-32-32-02 W4M
Location Alias 2: 02/04-32-032-02 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 02
Section: 32
County/Municipality: Special Areas No. 4
Well Name: PENN WEST 102 HZ ESTHER 4-32-32-2
Operator Name: Obsidian Energy Ltd.
License Number: 0478291
License Date: 2015-12-09
License Status: Amended
Spud Date: 2016-08-31
Final Drill Date: 2016-09-02
Well Total Depth: 2268.00 m
Surface Hole Latitude: 51.795694
Surface Hole Longitude: -110.260225

For data sources see[1][2]

Well History

Date Event
2015-12-09 Obtained License
2016-08-31 Surface Casing Operation Performed
2016-09-01 Direction Drilling Operation Performed - Deviate
2016-09-01 Direction Drilling Operation Performed - Horizontal
2016-09-02 Finished Drilling
2016-09-02 Well Log Performed
2016-09-02 Well Mode changed to Drilled and Cased
2016-09-03 Production Casing Operation Performed
2016-09-03 Rig Released
2016-09-03 Well Log Performed
2016-11-02 Perforation Treatment Performed - Abrasa-Jet Perforation
2016-11-06 Perforation Treatment Performed - Multi-Stage Fracture
2016-11-07 Perforation Treatment Performed - Multi-Stage Fracture
2016-11-16 Well Began Production
2016-11-16 Well Fluid changed to Crude Oil
2016-11-16 Well Mode changed to Flowing
2016-11-29 Well Fluid changed to Crude Oil
2016-11-29 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-08-31 Precision Drilling Corporation 152 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-09-01 347.70 Deviate (5 - 79 degrees)
2016-09-01 889.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-11-02 Hydra Jet Perforation 2251.10 2251.80 0
2016-11-07 Multi-Stage Fracture 1901.50 1901.70 0
2016-11-07 Multi-Stage Fracture 1862.10 1862.30 0
2016-11-07 Multi-Stage Fracture 1823.30 1823.50 0
2016-11-07 Multi-Stage Fracture 1784.00 1784.20 0
2016-11-07 Multi-Stage Fracture 1744.30 1744.50 0
2016-11-07 Multi-Stage Fracture 1704.80 1705.00 0
2016-11-07 Multi-Stage Fracture 1665.70 1665.90 0
2016-11-07 Multi-Stage Fracture 1626.00 1626.20 0
2016-11-07 Multi-Stage Fracture 1586.50 1586.70 0
2016-11-07 Multi-Stage Fracture 1547.00 1547.20 0
2016-11-06 Multi-Stage Fracture 2237.80 2238.00 0
2016-11-07 Multi-Stage Fracture 1507.40 1507.60 0
2016-11-07 Multi-Stage Fracture 1468.40 1468.60 0
2016-11-07 Multi-Stage Fracture 1428.70 1428.90 0
2016-11-07 Multi-Stage Fracture 1389.50 1389.70 0
2016-11-07 Multi-Stage Fracture 1349.50 1349.70 0
2016-11-07 Multi-Stage Fracture 1309.90 1310.10 0
2016-11-07 Multi-Stage Fracture 1270.70 1270.90 0
2016-11-07 Multi-Stage Fracture 1230.80 1231.00 0
2016-11-07 Multi-Stage Fracture 1191.70 1191.90 0
2016-11-07 Multi-Stage Fracture 1152.60 1152.80 0
2016-11-06 Multi-Stage Fracture 2212.00 2212.20 0
2016-11-07 Multi-Stage Fracture 1113.60 1113.80 0
2016-11-07 Multi-Stage Fracture 1074.50 1074.70 0
2016-11-07 Multi-Stage Fracture 1035.40 1035.60 0
2016-11-07 Multi-Stage Fracture 995.70 995.80 0
2016-11-07 Multi-Stage Fracture 956.10 956.30 0
2016-11-07 Multi-Stage Fracture 903.40 903.60 0
2016-11-07 Multi-Stage Fracture 877.80 878.00 0
2016-11-06 Multi-Stage Fracture 2175.60 2175.80 0
2016-11-07 Multi-Stage Fracture 2098.40 2098.60 0
2016-11-07 Multi-Stage Fracture 2058.90 2059.10 0
2016-11-07 Multi-Stage Fracture 2019.70 2019.90 0
2016-11-07 Multi-Stage Fracture 1980.80 1981.00 0
2016-11-07 Multi-Stage Fracture 1940.90 1941.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-11-06 2016-11-07 711 970 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 10.9208 N/A
potassium chloride 7447-40-7 100 57.0308 N/A
water Not Available 100 57.0308 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 31.7695 N/A
GBE-1:5 Trican Breaker non-hazardous ingredients Not Available 100 0.0048 N/A
propylene glycol 57-55-6 100 0.0048 N/A
WF-2 Trican Foamer 2-butoxyethanol 111-76-2 100 0.1774 N/A
non-hazardous ingredients Not Available 100 0.1774 N/A
poly(oxy-1.2-ethanediyl). a-hexyl-w-hydroxy 31726-34-8 100 0.1774 N/A
polyethylene glycol hexyl ether sulfate. ammonium salt 63428-86-4 100 0.1774 N/A
sulfonate. alkyl (C14-16)olefin. sodium salt 68439-57-6 100 0.1774 N/A
WG-111d Trican Gelling Agent guar gum 9000-30-0 100 0.0797 N/A
S-17W Trican Surfactant ethylene/propylene oxide polymer Not Available 100 0.0166 N/A
methanol 67-56-1 100 0.0166 N/A
water Not Available 100 0.0166 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-08-31 2016-09-02 Surface Water - Runoff 1010

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 779 0.0 0.0 0.0
2017 8151 0.0 0.0 0.0
2018 8284 0.0 0.0 0.0
2019 8352 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-08-31 No Incident Encountered 0.00 0.00
2016-11-16 No Incident Encountered 0.00 0.00

For data sources see[10]

References