X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324023202000

Well Details

Well ID: 0324023202000
Loading map...
Location: 00/02-32-032-02W4/0
Location Alias: 00/02-32-32-02 W4M
Location Alias 2: 00/02-32-032-02 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 02
Section: 32
County/Municipality: Special Areas No. 4
Well Name: PENN WEST HZ ESTHER 2-32-32-2
Operator Name: Obsidian Energy Ltd.
License Number: 0478308
License Date: 2015-12-09
License Status: Issued
Spud Date: 2016-08-20
Final Drill Date: 2016-08-23
Well Total Depth: 2211.00 m
Surface Hole Latitude: 51.795515
Surface Hole Longitude: -110.247693

For data sources see[1][2]

Well History

Date Event
2015-12-09 Obtained License
2016-08-20 Surface Casing Operation Performed
2016-08-21 Direction Drilling Operation Performed - Deviate
2016-08-22 Direction Drilling Operation Performed - Horizontal
2016-08-23 Finished Drilling
2016-08-23 Production Casing Operation Performed
2016-08-23 Well Log Performed
2016-08-23 Well Mode changed to Drilled and Cased
2016-08-24 Rig Released
2016-11-14 Perforation Treatment Performed - Multi-Stage Fracture
2016-11-15 Perforation Treatment Performed - Abrasa-Jet Perforation
2016-11-15 Perforation Treatment Performed - Multi-Stage Fracture
2016-11-17 Well Began Production
2016-11-17 Well Fluid changed to Crude Oil
2016-11-17 Well Mode changed to Flowing
2016-11-22 Well Log Performed
2017-06-01 Well Fluid changed to Crude Oil
2017-06-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-08-20 Precision Drilling Corporation 152 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-08-21 408.60 Deviate (5 - 79 degrees)
2016-08-22 822.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-11-14 Multi-Stage Fracture 2194.40 2194.60 0
2016-11-15 Multi-Stage Fracture 1880.70 1880.90 0
2016-11-15 Multi-Stage Fracture 1841.70 1841.90 0
2016-11-15 Hydra Jet Perforation 1803.00 1803.20 0
2016-11-15 Hydra Jet Perforation 1763.00 1763.20 0
2016-11-15 Hydra Jet Perforation 1725.00 1725.20 0
2016-11-15 Hydra Jet Perforation 1685.00 1685.20 0
2016-11-15 Multi-Stage Fracture 1528.90 1529.10 0
2016-11-15 Multi-Stage Fracture 1489.50 1489.70 0
2016-11-15 Multi-Stage Fracture 1450.40 1450.60 0
2016-11-15 Multi-Stage Fracture 1411.50 1411.70 0
2016-11-14 Multi-Stage Fracture 2153.60 2153.80 0
2016-11-15 Multi-Stage Fracture 1372.40 1372.60 0
2016-11-15 Multi-Stage Fracture 1332.80 1333.00 0
2016-11-15 Multi-Stage Fracture 1293.70 1293.90 0
2016-11-15 Multi-Stage Fracture 1254.10 1254.30 0
2016-11-15 Multi-Stage Fracture 1215.10 1215.30 0
2016-11-15 Multi-Stage Fracture 1176.00 1176.20 0
2016-11-15 Multi-Stage Fracture 1137.00 1137.20 0
2016-11-15 Multi-Stage Fracture 1098.00 1098.20 0
2016-11-15 Multi-Stage Fracture 1058.80 1059.00 0
2016-11-15 Multi-Stage Fracture 1019.80 1020.00 0
2016-11-14 Multi-Stage Fracture 2114.40 2144.60 0
2016-11-15 Multi-Stage Fracture 982.30 982.50 0
2016-11-15 Multi-Stage Fracture 943.20 943.40 0
2016-11-15 Multi-Stage Fracture 904.20 904.40 0
2016-11-15 Multi-Stage Fracture 851.80 852.00 0
2016-11-14 Multi-Stage Fracture 2075.40 2075.60 0
2016-11-14 Multi-Stage Fracture 2036.70 2036.90 0
2016-11-14 Multi-Stage Fracture 1997.70 1997.90 0
2016-11-14 Multi-Stage Fracture 1992.00 1992.20 0
2016-11-15 Multi-Stage Fracture 1959.00 1959.60 0
2016-11-15 Multi-Stage Fracture 1919.60 1919.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-11-14 2016-11-15 721 780 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 11.2934 N/A
potassium chloride 7447-40-7 100 56.1919 N/A
water Not Available 100 56.1919 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 32.2379 N/A
GBE-1:5 Trican Breaker non-hazardous ingredients Not Available 100 0.0047 N/A
propylene glycol 57-55-6 100 0.0047 N/A
WF-2 Trican Foamer 2-butoxyethanol 111-76-2 100 0.1761 N/A
non-hazardous ingredients Not Available 100 0.1761 N/A
poly(oxy-1.2-ethanediyl). a-hexyl-w-hydroxy 31726-34-8 100 0.1761 N/A
polyethylene glycol hexyl ether sulfate. ammonium salt 63428-86-4 100 0.1761 N/A
sulfonate. alkyl (C14-16)olefin. sodium salt 68439-57-6 100 0.1761 N/A
WG-111DA Trican Gelling Agent fumaric acid 110-17-8 100 0.0791 N/A
guar gum 9000-30-0 100 0.0791 N/A
S-17W Trican Surfactant ethylene/propylene oxide polymer Not Available 100 0.0165 N/A
methanol 67-56-1 100 0.0165 N/A
water Not Available 100 0.0165 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-08-20 2016-08-23 Surface Water - Runoff 757

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 443 0.0 0.0 0.0
2017 8419 0.0 0.0 0.0
2018 8584 0.0 0.0 0.0
2019 8711 0.0 0.0 0.0
2020 2179 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-08-24 No Incident Encountered 0.00 0.00
2016-11-22 No Incident Encountered 0.00 0.00

For data sources see[10]

References