X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324022903000

Well Details

Well ID: 0324022903000
Loading map...
Location: 00/03-29-032-02W4/0
Location Alias: 00/03-29-32-02 W4M
Location Alias 2: 00/03-29-032-02 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 02
Section: 29
County/Municipality: Special Areas No. 4
Well Name: ANEGADA HZ 3A ESTHER 3-29-32-2
Operator Name: Baytex Energy Ltd.
License Number: 0472019
License Date: 2014-11-24
License Status: Amended
Spud Date: 2015-08-05
Final Drill Date: 2015-08-07
Well Total Depth: 2446.00 m
Surface Hole Latitude: 51.782328
Surface Hole Longitude: -110.252181

For data sources see[1][2]

Well History

Date Event
2014-11-24 Obtained License
2015-08-05 Direction Drilling Operation Performed - Deviate
2015-08-05 Surface Casing Operation Performed
2015-08-06 Direction Drilling Operation Performed - Horizontal
2015-08-07 Finished Drilling
2015-08-07 Well Log Performed
2015-08-07 Well Mode changed to Drilled and Cased
2015-08-08 Production Casing Operation Performed
2015-08-08 Rig Released
2015-08-25 Well Log Performed
2015-09-21 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-22 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-26 Well Began Production
2015-09-26 Well Fluid changed to Crude Oil
2015-09-26 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-08-05 Precision Drilling Corporation 145 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-08-05 246.30 Deviate (5 - 79 degrees)
2015-08-06 958.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-09-21 Multi-Stage Fracture 2425.00 2425.50 0
2015-09-21 Multi-Stage Fracture 2110.00 2110.50 0
2015-09-21 Multi-Stage Fracture 2074.00 2074.50 0
2015-09-21 Multi-Stage Fracture 2043.00 2043.50 0
2015-09-21 Multi-Stage Fracture 2005.00 2005.50 0
2015-09-21 Multi-Stage Fracture 1966.00 1966.50 0
2015-09-21 Multi-Stage Fracture 1935.00 1935.50 0
2015-09-21 Multi-Stage Fracture 1899.00 1899.50 0
2015-09-21 Multi-Stage Fracture 1868.00 1868.50 0
2015-09-21 Multi-Stage Fracture 1830.00 1830.50 0
2015-09-21 Multi-Stage Fracture 1800.50 1801.00 0
2015-09-21 Multi-Stage Fracture 2386.00 2386.50 0
2015-09-21 Multi-Stage Fracture 1760.00 1760.50 0
2015-09-21 Multi-Stage Fracture 1721.00 1721.50 0
2015-09-21 Multi-Stage Fracture 1690.00 1690.50 0
2015-09-21 Multi-Stage Fracture 1636.00 1636.50 0
2015-09-22 Multi-Stage Fracture 1600.00 1600.50 0
2015-09-22 Multi-Stage Fracture 1569.00 1569.50 0
2015-09-22 Multi-Stage Fracture 1530.00 1530.50 0
2015-09-22 Multi-Stage Fracture 1492.00 1492.50 0
2015-09-22 Multi-Stage Fracture 1461.00 1461.50 0
2015-09-22 Multi-Stage Fracture 1425.00 1425.50 0
2015-09-21 Multi-Stage Fracture 2355.00 2355.50 0
2015-09-22 Multi-Stage Fracture 1394.00 1394.50 0
2015-09-22 Multi-Stage Fracture 1355.00 1355.50 0
2015-09-22 Multi-Stage Fracture 1317.00 1317.50 0
2015-09-22 Multi-Stage Fracture 1286.00 1286.50 0
2015-09-22 Multi-Stage Fracture 1249.00 1249.50 0
2015-09-22 Multi-Stage Fracture 1209.00 1209.50 0
2015-09-22 Multi-Stage Fracture 1178.00 1178.50 0
2015-09-22 Multi-Stage Fracture 1140.00 1140.50 0
2015-09-22 Multi-Stage Fracture 1108.00 1108.50 0
2015-09-21 Multi-Stage Fracture 2326.00 2326.50 0
2015-09-21 Multi-Stage Fracture 2286.00 2286.50 0
2015-09-21 Multi-Stage Fracture 2249.00 2249.50 0
2015-09-21 Multi-Stage Fracture 2218.00 2218.50 0
2015-09-21 Multi-Stage Fracture 2180.00 2180.50 0
2015-09-21 Multi-Stage Fracture 2141.00 2141.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-09-21 2015-09-22 702 1,515 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 75.0588 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 24.4832 N/A
IH-CS-1 Fusion Technologies Inc. Clay Control Non-Whimis Regulated 64-18-6 100 0.2471 N/A
IH-FR-1C Fusion Technologies Inc. Friction Reducer Non-Whimis Regulated Not Available 100 0.1446 N/A
IH-NE-1 Fusion Technologies Inc. Surfactant 2-ethyhexanol 104-76-7 100 0.066 N/A
EO-C7-9-iso. C8-rich alcohols 78330-19-5 100 0.066 N/A
EO-C9-11-iso. C10-rich alcohols 78330-20-8 100 0.066 N/A
Heavy aromatic naptha 64742-94-5 100 0.066 N/A
Isopropanol 67-63-0 100 0.066 N/A
Methanol 67-56-1 100 0.066 N/A
Napthalene 91-20-3 100 0.066 N/A
Polyethylene glycol 25322-68-3 100 0.066 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-09-12 2015-09-22 Municipal Water 1386

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 2325 0.0 0.0 0.0
2016 8444 0.0 0.0 0.0
2017 8245 0.0 0.0 0.0
2018 8496 0.0 0.0 0.0
2019 8485 0.0 0.0 0.0
2020 2056 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-08-08 No Incident Encountered 0.00 0.00
2015-09-24 No Incident Encountered 0.00 0.00

For data sources see[10]

References