If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0324022903000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.782328,"lon":-110.252181,"icon":""}]} |
Location: 00/03-29-032-02W4/0 | |
Location Alias: 00/03-29-32-02 W4M | |
Location Alias 2: 00/03-29-032-02 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 032 | |
Meridian: 4 | |
Range: 02 | |
Section: 29 | |
County/Municipality: Special Areas No. 4 | |
Well Name: ANEGADA HZ 3A ESTHER 3-29-32-2 | |
Operator Name: Baytex Energy Ltd. | |
License Number: 0472019 | |
License Date: 2014-11-24 | |
License Status: Amended | |
Spud Date: 2015-08-05 | |
Final Drill Date: 2015-08-07 | |
Well Total Depth: 2446.00 m | |
Surface Hole Latitude: 51.782328 | |
Surface Hole Longitude: -110.252181 |
Date | Event |
---|---|
2014-11-24 | Obtained License |
2015-08-05 | Direction Drilling Operation Performed - Deviate |
2015-08-05 | Surface Casing Operation Performed |
2015-08-06 | Direction Drilling Operation Performed - Horizontal |
2015-08-07 | Finished Drilling |
2015-08-07 | Well Log Performed |
2015-08-07 | Well Mode changed to Drilled and Cased |
2015-08-08 | Production Casing Operation Performed |
2015-08-08 | Rig Released |
2015-08-25 | Well Log Performed |
2015-09-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-09-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-09-26 | Well Began Production |
2015-09-26 | Well Fluid changed to Crude Oil |
2015-09-26 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2015-08-05 | Precision Drilling Corporation | 145 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2015-08-05 | 246.30 | Deviate (5 - 79 degrees) |
2015-08-06 | 958.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2015-09-21 | Multi-Stage Fracture | 2425.00 | 2425.50 | 0 |
2015-09-21 | Multi-Stage Fracture | 2110.00 | 2110.50 | 0 |
2015-09-21 | Multi-Stage Fracture | 2074.00 | 2074.50 | 0 |
2015-09-21 | Multi-Stage Fracture | 2043.00 | 2043.50 | 0 |
2015-09-21 | Multi-Stage Fracture | 2005.00 | 2005.50 | 0 |
2015-09-21 | Multi-Stage Fracture | 1966.00 | 1966.50 | 0 |
2015-09-21 | Multi-Stage Fracture | 1935.00 | 1935.50 | 0 |
2015-09-21 | Multi-Stage Fracture | 1899.00 | 1899.50 | 0 |
2015-09-21 | Multi-Stage Fracture | 1868.00 | 1868.50 | 0 |
2015-09-21 | Multi-Stage Fracture | 1830.00 | 1830.50 | 0 |
2015-09-21 | Multi-Stage Fracture | 1800.50 | 1801.00 | 0 |
2015-09-21 | Multi-Stage Fracture | 2386.00 | 2386.50 | 0 |
2015-09-21 | Multi-Stage Fracture | 1760.00 | 1760.50 | 0 |
2015-09-21 | Multi-Stage Fracture | 1721.00 | 1721.50 | 0 |
2015-09-21 | Multi-Stage Fracture | 1690.00 | 1690.50 | 0 |
2015-09-21 | Multi-Stage Fracture | 1636.00 | 1636.50 | 0 |
2015-09-22 | Multi-Stage Fracture | 1600.00 | 1600.50 | 0 |
2015-09-22 | Multi-Stage Fracture | 1569.00 | 1569.50 | 0 |
2015-09-22 | Multi-Stage Fracture | 1530.00 | 1530.50 | 0 |
2015-09-22 | Multi-Stage Fracture | 1492.00 | 1492.50 | 0 |
2015-09-22 | Multi-Stage Fracture | 1461.00 | 1461.50 | 0 |
2015-09-22 | Multi-Stage Fracture | 1425.00 | 1425.50 | 0 |
2015-09-21 | Multi-Stage Fracture | 2355.00 | 2355.50 | 0 |
2015-09-22 | Multi-Stage Fracture | 1394.00 | 1394.50 | 0 |
2015-09-22 | Multi-Stage Fracture | 1355.00 | 1355.50 | 0 |
2015-09-22 | Multi-Stage Fracture | 1317.00 | 1317.50 | 0 |
2015-09-22 | Multi-Stage Fracture | 1286.00 | 1286.50 | 0 |
2015-09-22 | Multi-Stage Fracture | 1249.00 | 1249.50 | 0 |
2015-09-22 | Multi-Stage Fracture | 1209.00 | 1209.50 | 0 |
2015-09-22 | Multi-Stage Fracture | 1178.00 | 1178.50 | 0 |
2015-09-22 | Multi-Stage Fracture | 1140.00 | 1140.50 | 0 |
2015-09-22 | Multi-Stage Fracture | 1108.00 | 1108.50 | 0 |
2015-09-21 | Multi-Stage Fracture | 2326.00 | 2326.50 | 0 |
2015-09-21 | Multi-Stage Fracture | 2286.00 | 2286.50 | 0 |
2015-09-21 | Multi-Stage Fracture | 2249.00 | 2249.50 | 0 |
2015-09-21 | Multi-Stage Fracture | 2218.00 | 2218.50 | 0 |
2015-09-21 | Multi-Stage Fracture | 2180.00 | 2180.50 | 0 |
2015-09-21 | Multi-Stage Fracture | 2141.00 | 2141.50 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-09-21 | 2015-09-22 | 702 | 1,515 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | 7732-18-5 | 100 | 75.0588 | N/A | |||
Frac Sand - Regular | Iron Horse Energy Services | Crystalline Silica | 14808-60-7 | 100 | 24.4832 | N/A | ||
IH-CS-1 | Fusion Technologies Inc. | Clay Control | Non-Whimis Regulated | 64-18-6 | 100 | 0.2471 | N/A | |
IH-FR-1C | Fusion Technologies Inc. | Friction Reducer | Non-Whimis Regulated | Not Available | 100 | 0.1446 | N/A | |
IH-NE-1 | Fusion Technologies Inc. | Surfactant | 2-ethyhexanol | 104-76-7 | 100 | 0.066 | N/A | |
EO-C7-9-iso. C8-rich alcohols | 78330-19-5 | 100 | 0.066 | N/A | ||||
EO-C9-11-iso. C10-rich alcohols | 78330-20-8 | 100 | 0.066 | N/A | ||||
Heavy aromatic naptha | 64742-94-5 | 100 | 0.066 | N/A | ||||
Isopropanol | 67-63-0 | 100 | 0.066 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.066 | N/A | ||||
Napthalene | 91-20-3 | 100 | 0.066 | N/A | ||||
Polyethylene glycol | 25322-68-3 | 100 | 0.066 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2015-09-12 | 2015-09-22 | Municipal Water | 1386 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 2325 | 0.0 | 0.0 | 0.0 |
2016 | 8444 | 0.0 | 0.0 | 0.0 |
2017 | 8245 | 0.0 | 0.0 | 0.0 |
2018 | 8496 | 0.0 | 0.0 | 0.0 |
2019 | 8485 | 0.0 | 0.0 | 0.0 |
2020 | 2056 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-08-08 | No Incident Encountered | 0.00 | 0.00 |
2015-09-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]