X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324022301000

Well Details

Well ID: 0324022301000
Loading map...
Location: 00/01-23-032-02W4/0
Location Alias: 00/01-23-32-02 W4M
Location Alias 2: 00/01-23-032-02 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 02
Section: 23
County/Municipality: Special Areas No. 4
Well Name: PENN WEST HZ ESTHER 1-23-32-2
Operator Name: Obsidian Energy Ltd.
License Number: 0478479
License Date: 2015-12-15
License Status: Amended
Spud Date: 2016-09-19
Final Drill Date: 2016-09-22
Well Total Depth: 2309.00 m
Surface Hole Latitude: 51.766164
Surface Hole Longitude: -110.175572

For data sources see[1][2]

Well History

Date Event
2015-12-15 Obtained License
2016-09-19 Surface Casing Operation Performed
2016-09-20 Direction Drilling Operation Performed - Deviate
2016-09-20 Direction Drilling Operation Performed - Horizontal
2016-09-22 Finished Drilling
2016-09-22 Production Casing Operation Performed
2016-09-22 Well Log Performed
2016-09-22 Well Mode changed to Drilled and Cased
2016-09-23 Rig Released
2016-11-19 Perforation Treatment Performed - Multi-Stage Fracture
2016-11-20 Perforation Treatment Performed - Multi-Stage Fracture
2016-11-21 Well Began Production
2016-11-21 Well Fluid changed to Crude Oil
2016-11-21 Well Mode changed to Flowing
2016-11-27 Well Log Performed
2017-06-01 Well Fluid changed to Crude Oil
2017-06-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-09-19 Precision Drilling Corporation 152 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-09-20 407.20 Deviate (5 - 79 degrees)
2016-09-20 851.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-11-19 Multi-Stage Fracture 2266.10 2266.30 0
2016-11-20 Multi-Stage Fracture 1914.80 1915.00 0
2016-11-20 Multi-Stage Fracture 1876.00 1876.20 0
2016-11-20 Multi-Stage Fracture 1837.10 1837.30 0
2016-11-20 Multi-Stage Fracture 1798.10 1798.30 0
2016-11-20 Multi-Stage Fracture 1759.40 1759.60 0
2016-11-20 Multi-Stage Fracture 1720.50 1720.70 0
2016-11-20 Multi-Stage Fracture 1681.30 1681.50 0
2016-11-20 Multi-Stage Fracture 1643.00 1643.20 0
2016-11-20 Multi-Stage Fracture 1603.80 1604.00 0
2016-11-20 Multi-Stage Fracture 1564.80 1565.00 0
2016-11-19 Multi-Stage Fracture 2227.30 2227.50 0
2016-11-20 Multi-Stage Fracture 1525.60 1525.80 0
2016-11-20 Multi-Stage Fracture 1486.40 1486.60 0
2016-11-20 Multi-Stage Fracture 1447.50 1447.70 0
2016-11-20 Multi-Stage Fracture 1408.60 1408.80 0
2016-11-20 Multi-Stage Fracture 1369.10 1369.30 0
2016-11-20 Multi-Stage Fracture 1330.20 1330.40 0
2016-11-20 Multi-Stage Fracture 1291.20 1291.40 0
2016-11-20 Multi-Stage Fracture 1252.20 1252.40 0
2016-11-20 Multi-Stage Fracture 1213.10 1213.30 0
2016-11-20 Multi-Stage Fracture 1174.00 1174.20 0
2016-11-19 Multi-Stage Fracture 2188.20 2188.40 0
2016-11-20 Multi-Stage Fracture 1134.60 1134.80 0
2016-11-20 Multi-Stage Fracture 1095.70 1095.90 0
2016-11-20 Multi-Stage Fracture 1056.70 1056.90 0
2016-11-20 Multi-Stage Fracture 1017.50 1017.70 0
2016-11-20 Multi-Stage Fracture 978.50 978.70 0
2016-11-20 Multi-Stage Fracture 939.50 939.70 0
2016-11-20 Multi-Stage Fracture 899.90 900.10 0
2016-11-20 Multi-Stage Fracture 873.70 873.90 0
2016-11-19 Multi-Stage Fracture 2148.50 2148.70 0
2016-11-20 Multi-Stage Fracture 2109.70 2109.90 0
2016-11-20 Multi-Stage Fracture 2070.70 2070.90 0
2016-11-20 Multi-Stage Fracture 2031.80 2032.00 0
2016-11-20 Multi-Stage Fracture 1992.80 1993.00 0
2016-11-20 Multi-Stage Fracture 1953.90 1954.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-11-19 2016-11-20 726 976 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 10.7489 N/A
potassium chloride 7447-40-7 100 56.616 N/A
water Not Available 100 56.616 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 32.3599 N/A
GBE-1:5 Trican Breaker non-hazardous ingredients Not Available 100 0.0047 N/A
propylene glycol 57-55-6 100 0.0047 N/A
WF-2 Trican Foamer 2-butoxyethanol 111-76-2 100 0.175 N/A
non-hazardous ingredients Not Available 100 0.175 N/A
poly(oxy-1.2-ethanediyl). a-hexyl-w-hydroxy 31726-34-8 100 0.175 N/A
polyethylene glycol hexyl ether sulfate. ammonium salt 63428-86-4 100 0.175 N/A
sulfonate. alkyl (C14-16)olefin. sodium salt 68439-57-6 100 0.175 N/A
WG-111d Trican Gelling Agent guar gum 9000-30-0 100 0.0786 N/A
S-17W Trican Surfactant ethylene/propylene oxide polymer Not Available 100 0.0164 N/A
methanol 67-56-1 100 0.0164 N/A
water Not Available 100 0.0164 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-11-01 2016-11-23 Surface Water - Runoff 986

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 295 0.0 0.0 0.0
2017 8572 0.0 0.0 0.0
2018 8648 0.0 0.0 0.0
2019 8670 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-09-23 No Incident Encountered 0.00 0.00
2016-11-24 No Incident Encountered 0.00 0.00

For data sources see[10]

References