X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324022215000

Well Details

Well ID: 0324022215000
Loading map...
Location: 00/15-22-032-02W4/0
Location Alias: 00/15-22-32-02 W4M
Location Alias 2: 00/15-22-032-02 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 02
Section: 22
County/Municipality: Special Areas No. 4
Well Name: PENN WEST HZ ESTHER 15-22-32-2
Operator Name: Obsidian Energy Ltd.
License Number: 0418996
License Date: 2010-03-02
License Status: Issued
Spud Date: 2010-10-04
Final Drill Date: 2010-10-10
Well Total Depth: 2265.00 m
Surface Hole Latitude: 51.751341
Surface Hole Longitude: -110.192784

For data sources see[1][2]

Well History

Date Event
2010-03-02 Obtained License
2010-10-05 Surface Casing Operation Performed
2010-10-05 Well Log Performed
2010-10-06 Direction Drilling Operation Performed - Horizontal
2010-10-07 Intermediate Casing Operation Performed
2010-10-10 Finished Drilling
2010-10-10 Well Mode changed to Drilled and Cased
2010-10-11 Liner Casing Operation Performed
2010-10-11 Rig Released
2010-11-13 Perforation Treatment Performed - Multi-Stage Fracture
2010-11-13 Perforation Treatment Performed - Open-Hole Completion
2010-12-09 Well Began Production
2010-12-09 Well Fluid changed to Gas
2010-12-09 Well Mode changed to Flowing
2012-02-15 Well Log Performed
2017-06-01 Well Fluid changed to Gas
2017-06-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-10-06 385.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-11-13 Open Hole/Barefoot Completion 2050.90 2265.00 0
2010-11-13 Multi-Stage Fracture 1421.50 1421.60 0
2010-11-13 Multi-Stage Fracture 1346.70 1346.80 0
2010-11-13 Multi-Stage Fracture 1257.70 1257.80 0
2010-11-13 Multi-Stage Fracture 1182.10 1182.20 0
2010-11-13 Multi-Stage Fracture 1106.50 1106.60 0
2010-11-13 Multi-Stage Fracture 1031.30 1031.40 0
2010-11-13 Multi-Stage Fracture 955.70 955.80 0
2010-11-13 Multi-Stage Fracture 881.40 881.50 0
2010-11-13 Multi-Stage Fracture 2033.30 2033.40 0
2010-11-13 Multi-Stage Fracture 1957.90 1958.00 0
2010-11-13 Multi-Stage Fracture 1882.40 1882.50 0
2010-11-13 Multi-Stage Fracture 1808.20 1808.30 0
2010-11-13 Multi-Stage Fracture 1720.30 1720.40 0
2010-11-13 Multi-Stage Fracture 1645.20 1645.30 0
2010-11-13 Multi-Stage Fracture 1572.30 1572.40 0
2010-11-13 Multi-Stage Fracture 1497.00 1497.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 600 0.0 0.0 0.0
2011 8694 0.0 0.0 0.0
2012 8736 0.0 0.0 0.0
2013 8664 0.0 0.0 0.0
2014 5976 0.0 0.0 0.0
2015 7991 0.0 0.0 0.0
2016 7295 0.0 0.0 0.0
2017 8015 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8041 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-11-13 No Incident Encountered 0.00 0.00

For data sources see[7]

References