X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324022211000

Well Details

Well ID: 0324022211000
Loading map...
Location: 00/11-22-032-02W4/0
Location Alias: 00/11-22-32-02 W4M
Location Alias 2: 00/11-22-032-02 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 02
Section: 22
County/Municipality: Special Areas No. 4
Well Name: PENN WEST ET AL ESTHER 11-22-32-2
Operator Name: Obsidian Energy Ltd.
License Number: 0081402
License Date: 1980-02-28
License Status: RecCertified
Spud Date: 1980-03-12
Final Drill Date: 1980-03-17
Well Total Depth: 828.00 m
Surface Hole Latitude: 51.761452
Surface Hole Longitude: -110.206499

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-02-28 Obtained License
1980-03-14 Drill Stem Test Performed
1980-03-17 Drill Stem Test Performed
1980-03-17 Finished Drilling
1980-03-18 Drill Stem Test Performed
1980-03-19 Drill Stem Test Performed
1980-03-19 Production Casing Operation Performed
1980-03-20 Well Mode changed to Drilled and Cased
1980-03-24 Perforation Treatment Performed - Jet Perforation
1982-02-12 Well Began Production
1982-02-12 Well Fluid changed to Gas
1982-02-12 Well Mode changed to Flowing
1983-01-01 Well Fluid changed to Gas
1983-01-01 Well Mode changed to Suspended
1987-06-09 Perforation Treatment Performed - Jet Perforation
1987-06-09 Well Fluid changed to Gas
1987-06-09 Well Mode changed to Suspended
1987-07-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-07-19 Perforation Treatment Performed - Fractured
1998-08-02 Well Log Performed
1998-08-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-08-03 Plug Back Performed
1998-08-03 Well Fluid changed to Gas
1998-08-03 Well Mode changed to Abandoned Zone
1998-08-18 Perforation Treatment Performed - Cement Plug
1998-08-18 Perforation Treatment Performed - Jet Perforation
1998-08-18 Perforation Treatment Performed - Remedial Casing
1998-08-18 Well Log Performed
1998-08-19 Perforation Treatment Performed - Jet Perforation
1998-08-19 Well Log Performed
1998-08-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-08-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-08-20 Perforation Treatment Performed - Remedial Casing
1998-08-21 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-03-24 Perforation 723.00 724.50 13
1998-08-18 Cement Plug 170.00 198.00 0
1998-08-19 Perforation 156.00 157.00 14
1998-08-19 Perforation 166.00 167.00 14
1998-08-20 Acid Treatment 156.00 157.00 0
1998-08-20 Acid Treatment 166.00 167.00 0
1998-08-20 Remedial Casing Cementing 156.00 167.00 0
1998-08-20 Packing Device Capped w/Cement 160.00 160.00 0
1980-03-24 Perforation 726.00 727.00 13
1987-06-09 Perforation 738.50 743.50 13
1987-07-18 Acid Treatment 738.50 743.50 0
1987-07-19 Fracture 738.50 743.50 0
1998-08-03 Packing Device Capped w/Cement 727.00 735.00 0
1998-08-03 Packing Device Capped w/Cement 712.00 720.00 0
1998-08-18 Perforation 197.00 198.00 14
1998-08-18 Remedial Casing Cementing 197.00 198.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 2636 0.0 0.0 0.0
1984 123 0.0 0.0 0.0

For data sources see[5]

References