If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0324011804020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.755142,"lon":-110.143284,"icon":""}]} |
Location: 02/04-18-032-01W4/0 | |
Location Alias: 02/04-18-32-01 W4M | |
Location Alias 2: 02/04-18-032-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 032 | |
Meridian: 4 | |
Range: 01 | |
Section: 18 | |
County/Municipality: Special Areas No. 4 | |
Well Name: PENN WEST 102 HZ ESTHER 4-18-32-1 | |
Operator Name: Obsidian Energy Ltd. | |
License Number: 0483230 | |
License Date: 2017-03-20 | |
License Status: Issued | |
Spud Date: 2017-07-17 | |
Final Drill Date: 2017-07-22 | |
Well Total Depth: 2555.00 m | |
Surface Hole Latitude: 51.755142 | |
Surface Hole Longitude: -110.143284 |
Date | Event |
---|---|
2017-03-20 | Obtained License |
2017-07-17 | Surface Casing Operation Performed |
2017-07-18 | Direction Drilling Operation Performed - Deviate |
2017-07-18 | Direction Drilling Operation Performed - Horizontal |
2017-07-18 | Production Casing Operation Performed |
2017-07-20 | Well Log Performed |
2017-07-22 | Finished Drilling |
2017-07-22 | Rig Released |
2017-07-22 | Well Mode changed to Drilled and Cased |
2017-08-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-08-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-08-27 | Well Began Production |
2017-08-27 | Well Fluid changed to Crude Oil |
2017-08-27 | Well Mode changed to Flowing |
2017-09-02 | Well Log Performed |
2017-10-28 | Well Fluid changed to Crude Oil |
2017-10-28 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-07-17 | Precision Drilling Corporation | 152 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-07-18 | 363.40 | Deviate (5 - 79 degrees) |
2017-07-18 | 879.70 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-08-26 | Multi-Stage Fracture | 2532.40 | 2533.20 | 0 |
2017-08-26 | Multi-Stage Fracture | 2042.60 | 2043.50 | 0 |
2017-08-26 | Multi-Stage Fracture | 1988.50 | 1989.40 | 0 |
2017-08-26 | Multi-Stage Fracture | 1983.50 | 1984.40 | 0 |
2017-08-26 | Multi-Stage Fracture | 1934.00 | 1934.90 | 0 |
2017-08-26 | Multi-Stage Fracture | 1879.40 | 1880.30 | 0 |
2017-08-26 | Multi-Stage Fracture | 1825.10 | 1826.00 | 0 |
2017-08-26 | Multi-Stage Fracture | 1770.80 | 1771.70 | 0 |
2017-08-26 | Multi-Stage Fracture | 1716.00 | 1716.90 | 0 |
2017-08-26 | Multi-Stage Fracture | 1661.80 | 1662.70 | 0 |
2017-08-26 | Multi-Stage Fracture | 1606.90 | 1607.80 | 0 |
2017-08-26 | Multi-Stage Fracture | 2478.60 | 2479.50 | 0 |
2017-08-26 | Multi-Stage Fracture | 1552.10 | 1553.00 | 0 |
2017-08-26 | Multi-Stage Fracture | 1497.70 | 1498.60 | 0 |
2017-08-26 | Multi-Stage Fracture | 1457.40 | 1458.30 | 0 |
2017-08-26 | Multi-Stage Fracture | 1416.10 | 1417.00 | 0 |
2017-08-27 | Multi-Stage Fracture | 1374.80 | 1375.70 | 0 |
2017-08-27 | Multi-Stage Fracture | 1320.40 | 1321.30 | 0 |
2017-08-27 | Multi-Stage Fracture | 1265.90 | 1266.80 | 0 |
2017-08-27 | Multi-Stage Fracture | 1211.80 | 1212.70 | 0 |
2017-08-27 | Multi-Stage Fracture | 1158.20 | 1159.10 | 0 |
2017-08-27 | Multi-Stage Fracture | 1104.00 | 1104.90 | 0 |
2017-08-26 | Multi-Stage Fracture | 2423.80 | 2424.70 | 0 |
2017-08-27 | Multi-Stage Fracture | 1049.20 | 1050.10 | 0 |
2017-08-27 | Multi-Stage Fracture | 989.50 | 990.40 | 0 |
2017-08-27 | Multi-Stage Fracture | 939.90 | 940.80 | 0 |
2017-08-27 | Multi-Stage Fracture | 885.10 | 886.00 | 0 |
2017-08-26 | Multi-Stage Fracture | 2369.80 | 2370.70 | 0 |
2017-08-26 | Multi-Stage Fracture | 2315.10 | 2316.00 | 0 |
2017-08-26 | Multi-Stage Fracture | 2260.60 | 2261.50 | 0 |
2017-08-26 | Multi-Stage Fracture | 2205.80 | 2206.70 | 0 |
2017-08-26 | Multi-Stage Fracture | 2151.50 | 2152.40 | 0 |
2017-08-26 | Multi-Stage Fracture | 2097.20 | 2098.10 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-08-26 | 2017-08-27 | 743 | 1,190 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | 7732-18-5 | 100 | 64.4936 | N/A | |||
Frac Sand - Regular | Iron Horse Energy Services | Crystalline Silica | 14808-60-7 | 100 | 23.5299 | N/A | ||
Tolcide PS75LT | Fusion Technologies Inc. | Bactericide/Biocide | Tetrakis(Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0478 | N/A | |
water | 7732-18-5 | 100 | 0.0478 | N/A | ||||
IH-BEZ-6D | Fusion Technologies Inc. | Breaker | Ethylene glycol | 107-21-1 | 100 | 0.0498 | N/A | |
Nitrogen | Iron Horse Energy Services | Energizing Fluid | nitrogen | 7727-37-9 | 100 | 11.3804 | N/A | |
IH-FM-2 | Fusion Technologies Inc. | Foamer | 2-butoxyethanol | 111-76-2 | 100 | 0.218 | N/A | |
EO-Dodecyl Alcohol | 32612-48-9 | 100 | 0.218 | N/A | ||||
Ethanol | 64-17-5 | 100 | 0.218 | N/A | ||||
Isopropanol | 67-63-0 | 100 | 0.218 | N/A | ||||
Sodium C14 to C16 Olefin | 68439-57-6 | 100 | 0.218 | N/A | ||||
Water | 7732-18-5 | 100 | 0.218 | N/A | ||||
IH-GA-1 | Fusion Technologies Inc. | Gelling Agent | Low toxicity mineral oil | 8042-47-5 | 100 | 0.2195 | N/A | |
IH-NE-7 | Fusion Technologies Inc. | Surfactant | Methanol | 67-56-1 | 100 | 0.0607 | N/A | |
Trimethylopropane ethoxylated | 52624-57-4 | 100 | 0.0607 | N/A | ||||
water | 7732-18-5 | 100 | 0.0607 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-08-19 | 2017-08-26 | Surface Water - Runoff | 1452 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 1909 | 0.0 | 0.0 | 0.0 |
2018 | 8522 | 0.0 | 0.0 | 0.0 |
2019 | 8546 | 0.0 | 0.0 | 0.0 |
2020 | 2115 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-07-22 | No Incident Encountered | 0.00 | 0.00 |
2017-09-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]