X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0315092605000

Well Details

Well ID: 0315092605000
Loading map...
Location: 00/05-26-031-09W5/0
Location Alias: 00/05-26-31-09 W5M
Location Alias 2: 00/05-26-031-09 W5/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 5
Range: 09
Section: 26
County/Municipality: Clearwater County
Well Name: SCL 15 BURNT 5-26-31-9
Operator Name: Shell Canada Limited
License Number: 0062495
License Date: 1977-02-01
License Status: RecCertified
Spud Date: 1977-03-08
Final Drill Date: 1977-06-11
Well Total Depth: 4114.80 m
Surface Hole Latitude: 51.686709
Surface Hole Longitude: -115.175072

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-02-01 Obtained License
1977-06-07 Well Log Performed
1977-06-11 Finished Drilling
1977-06-11 Well Mode changed to Drilled and Cased
1977-06-15 Production Casing Operation Performed
1977-06-24 Perforation Treatment Performed - Jet Perforation
1977-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-06-29 Perforation Treatment Performed - Jet Perforation
1977-06-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-07-29 Well Began Production
1977-07-29 Well Fluid changed to Gas
1977-07-29 Well Mode changed to Flowing
1996-12-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-12-21 Well Log Performed
2003-09-20 Perforation Treatment Performed - Cement Squeeze
2003-09-20 Plug Back Performed
2003-09-20 Well Fluid changed to Gas
2003-09-20 Well Mode changed to Abandoned Zone
2003-09-26 Well Log Performed
2003-10-03 Perforation Treatment Performed - Jet Perforation
2003-10-03 Well Log Performed
2003-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-10-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-21 Perforation Treatment Performed - Cement Squeeze
2005-10-21 Plug Back Performed
2005-10-23 Perforation Treatment Performed - Jet Perforation
2005-10-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-25 Perforation Treatment Performed - Cement Squeeze
2005-10-25 Plug Back Performed
2005-10-26 Perforation Treatment Performed - Jet Perforation
2005-10-27 Perforation Treatment Performed - Cement Plug
2005-10-27 Plug Back Performed
2005-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-28 Perforation Treatment Performed - Cement Squeeze
2005-10-28 Perforation Treatment Performed - Jet Perforation
2005-10-29 Perforation Treatment Performed - Jet Perforation
2005-10-30 Perforation Treatment Performed - Cement Squeeze
2005-10-31 Perforation Treatment Performed - Cement Plug
2005-10-31 Plug Back Performed
2005-10-31 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-06-24 Perforation 3531.10 3532.60 13
1977-06-29 Perforation 3441.50 3451.60 7
1977-06-30 Acid Treatment 3393.00 3451.60 0
1996-12-19 Acid Treatment 3393.00 3560.70 0
2003-09-20 Cement Squeeze 3393.00 3560.70 0
2003-10-03 Perforation 3953.00 3962.00 20
2003-10-04 Acid Treatment 3953.00 3962.00 0
2003-10-06 Acid Treatment 3953.00 3962.00 0
2005-10-21 Cement Squeeze 3953.00 3962.00 0
2005-10-21 Packing Device Capped w/Cement 3336.50 3367.50 0
2005-10-23 Perforation 1657.00 1658.00 13
1977-06-24 Perforation 3537.80 3542.70 13
2005-10-25 Cement Squeeze 1657.00 1658.00 0
2005-10-25 Packing Device Capped w/Cement 1625.00 1655.00 0
2005-10-26 Perforation 776.00 777.00 13
2005-10-27 Cement Plug 742.50 792.50 0
2005-10-28 Perforation 600.00 601.00 13
2005-10-28 Cement Squeeze 600.00 601.00 0
2005-10-28 Packing Device Capped w/Cement 565.50 595.50 0
2005-10-29 Perforation 530.00 531.00 13
2005-10-30 Cement Squeeze 530.00 531.00 0
2005-10-31 Cement Plug 15.70 23.70 0
1977-06-24 Perforation 3544.50 3547.30 13
1977-06-24 Perforation 3548.50 3553.10 13
1977-06-24 Perforation 3559.50 3560.70 13
1977-06-25 Acid Treatment 3531.10 3560.70 0
1977-06-29 Perforation 3393.00 3408.30 7
1977-06-29 Perforation 3409.50 3413.20 7
1977-06-29 Perforation 3415.00 3440.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 3722 0.0 0.0 0.0
1978 7447 0.0 0.0 0.0
1979 8217 0.0 0.0 0.0
1980 7760 0.0 0.0 0.0
1981 8492 0.0 0.0 0.0
1982 8626 0.0 0.0 0.0
1983 8758 0.0 0.0 0.0
1984 8596 0.0 0.0 0.0
1985 8547 0.0 0.0 0.0
1986 7743 0.0 0.0 0.0
1987 6951 0.0 0.0 0.0
1988 7537 0.0 0.0 0.0
1989 6338 0.0 0.0 0.0
1990 6498 0.0 0.0 0.0
1991 4761 0.0 0.0 0.0
1992 8473 0.0 0.0 0.0
1993 8287 0.0 0.0 0.0
1994 5266 0.0 0.0 0.0
1995 6139 0.0 0.0 0.0
1996 6875 0.0 0.0 0.0
1997 3419 0.0 0.0 0.0
1998 2741 0.0 0.0 0.0
1999 3803 0.0 0.0 0.0
2000 7909 0.0 0.0 0.0
2001 8453 0.0 0.0 0.0
2002 8709 0.0 0.0 0.0
2003 5900 0.0 0.0 0.0

For data sources see[5]

References