If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0315033513020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.692334,"lon":-114.32309,"icon":""}]} |
Location: 02/13-35-031-03W5/0 | |
Location Alias: 02/13-35-31-03 W5M | |
Location Alias 2: 02/13-35-031-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 031 | |
Meridian: 5 | |
Range: 03 | |
Section: 35 | |
County/Municipality: Mountain View County | |
Well Name: TRANSGLOBE HARME 13-35-31-3 | |
Operator Name: TransGlobe Energy Corporation | |
License Number: 0442562 | |
License Date: 2012-01-09 | |
License Status: Issued | |
Spud Date: 2012-01-23 | |
Final Drill Date: 2012-02-06 | |
Well Total Depth: 3385.00 m | |
Surface Hole Latitude: 51.692334 | |
Surface Hole Longitude: -114.323090 |
Date | Event |
---|---|
2012-01-09 | Obtained License |
2012-01-25 | Surface Casing Operation Performed |
2012-01-28 | Direction Drilling Operation Performed - Horizontal |
2012-02-01 | Intermediate Casing Operation Performed |
2012-02-06 | Finished Drilling |
2012-02-06 | Well Log Performed |
2012-02-06 | Well Mode changed to Drilled and Cased |
2012-02-07 | Well Log Performed |
2012-02-08 | Liner Casing Operation Performed |
2012-02-08 | Perforation Treatment Performed - Open-Hole Completion |
2012-02-09 | Rig Released |
2012-02-28 | Well Log Performed |
2012-03-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-14 | Well Began Production |
2012-03-14 | Well Fluid changed to Crude Oil |
2012-03-14 | Well Mode changed to Flowing |
2012-03-20 | Well Log Performed |
2012-03-31 | Well Fluid changed to Crude Oil |
2012-03-31 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-23 | Precision Drilling Corporation | 393 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-28 | 1580.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-08 | Open Hole/Barefoot Completion | 3369.00 | 3385.00 | 0 |
2012-03-10 | Multi-Stage Fracture | 2910.20 | 2910.30 | 0 |
2012-03-10 | Multi-Stage Fracture | 2857.80 | 2857.90 | 0 |
2012-03-10 | Multi-Stage Fracture | 2792.40 | 2792.50 | 0 |
2012-03-10 | Multi-Stage Fracture | 2739.90 | 2740.00 | 0 |
2012-03-10 | Multi-Stage Fracture | 2674.50 | 2674.60 | 0 |
2012-03-10 | Multi-Stage Fracture | 2609.20 | 2609.30 | 0 |
2012-03-10 | Multi-Stage Fracture | 2556.90 | 2557.00 | 0 |
2012-03-10 | Multi-Stage Fracture | 2491.50 | 2491.60 | 0 |
2012-03-10 | Multi-Stage Fracture | 2439.20 | 2439.30 | 0 |
2012-03-10 | Multi-Stage Fracture | 2373.90 | 2374.00 | 0 |
2012-03-09 | Multi-Stage Fracture | 3368.30 | 3368.40 | 0 |
2012-03-10 | Multi-Stage Fracture | 2307.90 | 2308.00 | 0 |
2012-03-10 | Multi-Stage Fracture | 2253.30 | 2253.40 | 0 |
2012-03-09 | Multi-Stage Fracture | 3328.80 | 3328.90 | 0 |
2012-03-09 | Multi-Stage Fracture | 3276.40 | 3276.50 | 0 |
2012-03-09 | Multi-Stage Fracture | 3211.10 | 3211.20 | 0 |
2012-03-09 | Multi-Stage Fracture | 3158.70 | 3158.80 | 0 |
2012-03-09 | Multi-Stage Fracture | 3093.30 | 3093.40 | 0 |
2012-03-10 | Multi-Stage Fracture | 3028.00 | 3028.10 | 0 |
2012-03-10 | Multi-Stage Fracture | 2975.60 | 2975.70 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 6642 | 0.0 | 0.0 | 0.0 |
2013 | 8445 | 0.0 | 0.0 | 0.0 |
2014 | 8105 | 0.0 | 0.0 | 0.0 |
2015 | 8719 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 7678 | 0.0 | 0.0 | 0.0 |
2019 | 7933 | 0.0 | 0.0 | 0.0 |
2020 | 2063 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-03-30 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]