If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0315033403000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.709242,"lon":-114.351816,"icon":""}]} |
Location: 00/03-34-031-03W5/0 | |
Location Alias: 00/03-34-31-03 W5M | |
Location Alias 2: 00/03-34-031-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 031 | |
Meridian: 5 | |
Range: 03 | |
Section: 34 | |
County/Municipality: Mountain View County | |
Well Name: BACCALIEU HZ HARME 3-34-31-3 | |
Operator Name: Baccalieu Energy Inc. | |
License Number: 0446954 | |
License Date: 2012-06-29 | |
License Status: Issued | |
Spud Date: 2012-07-23 | |
Final Drill Date: 2012-08-04 | |
Well Total Depth: 3458.00 m | |
Surface Hole Latitude: 51.709242 | |
Surface Hole Longitude: -114.351816 |
Date | Event |
---|---|
2012-06-29 | Obtained License |
2012-07-24 | Surface Casing Operation Performed |
2012-07-26 | Direction Drilling Operation Performed - Horizontal |
2012-07-30 | Intermediate Casing Operation Performed |
2012-07-30 | Well Log Performed |
2012-08-04 | Finished Drilling |
2012-08-04 | Well Mode changed to Drilled and Cased |
2012-08-06 | Liner Casing Operation Performed |
2012-08-08 | Rig Released |
2012-08-09 | Perforation Treatment Performed - Open-Hole Completion |
2012-08-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-28 | Perforation Treatment Performed - Jet Perforation |
2012-08-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-29 | Perforation Treatment Performed - Fractured |
2012-08-29 | Perforation Treatment Performed - Jet Perforation |
2012-08-30 | Perforation Treatment Performed - Fractured |
2012-08-30 | Perforation Treatment Performed - Jet Perforation |
2012-09-05 | Well Began Production |
2012-09-05 | Well Fluid changed to Crude Oil |
2012-09-05 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-07-23 | Ensign Drilling Inc. | 544 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-07-26 | 1677.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-08-09 | Open Hole/Barefoot Completion | 3450.00 | 3458.00 | 0 |
2012-08-28 | Multi-Stage Fracture | 2868.60 | 2868.70 | 0 |
2012-08-28 | Multi-Stage Fracture | 2796.40 | 2796.50 | 0 |
2012-08-28 | Multi-Stage Fracture | 2722.70 | 2722.80 | 0 |
2012-08-28 | Multi-Stage Fracture | 2663.60 | 2663.70 | 0 |
2012-08-28 | Multi-Stage Fracture | 2589.60 | 2589.70 | 0 |
2012-08-28 | Multi-Stage Fracture | 2520.00 | 2520.10 | 0 |
2012-08-28 | Multi-Stage Fracture | 2447.10 | 2447.20 | 0 |
2012-08-28 | Perforation | 2355.00 | 2356.00 | 13 |
2012-08-29 | Fracture | 2355.00 | 2356.00 | 0 |
2012-08-29 | Perforation | 2283.60 | 2284.60 | 13 |
2012-08-16 | Multi-Stage Fracture | 3426.70 | 3426.80 | 0 |
2012-08-29 | Fracture | 2283.60 | 2284.60 | 0 |
2012-08-29 | Perforation | 2178.30 | 2179.30 | 13 |
2012-08-30 | Fracture | 2178.30 | 2179.30 | 0 |
2012-08-30 | Perforation | 2117.60 | 2118.60 | 13 |
2012-08-30 | Fracture | 2117.60 | 2118.60 | 0 |
2012-08-16 | Multi-Stage Fracture | 3353.30 | 3353.40 | 0 |
2012-08-16 | Multi-Stage Fracture | 3294.90 | 3295.00 | 0 |
2012-08-16 | Multi-Stage Fracture | 3221.10 | 3221.20 | 0 |
2012-08-28 | Multi-Stage Fracture | 3148.70 | 3148.80 | 0 |
2012-08-28 | Multi-Stage Fracture | 3073.80 | 3073.90 | 0 |
2012-08-28 | Multi-Stage Fracture | 3014.70 | 3014.80 | 0 |
2012-08-28 | Multi-Stage Fracture | 2941.80 | 2941.90 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 2640 | 0.0 | 0.0 | 0.0 |
2013 | 8407 | 0.0 | 0.0 | 0.0 |
2014 | 8454 | 0.0 | 0.0 | 0.0 |
2015 | 8061 | 0.0 | 0.0 | 0.0 |
2016 | 8421 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 7938 | 0.0 | 0.0 | 0.0 |
2019 | 8599 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-08-08 | No Incident Encountered | 0.00 | 0.00 |
2012-09-06 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]