X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0315033402000

Well Details

Well ID: 0315033402000
Loading map...
Location: 00/02-34-031-03W5/0
Location Alias: 00/02-34-31-03 W5M
Location Alias 2: 00/02-34-031-03 W5/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 5
Range: 03
Section: 34
County/Municipality: Mountain View County
Well Name: BACCALIEU HZ HARME 2-34-31-3
Operator Name: Baccalieu Energy Inc.
License Number: 0446955
License Date: 2012-06-29
License Status: Issued
Spud Date: 2012-08-10
Final Drill Date: 2012-08-21
Well Total Depth: 3503.00 m
Surface Hole Latitude: 51.709644
Surface Hole Longitude: -114.336635

For data sources see[1][2]

Well History

Date Event
2012-06-29 Obtained License
2012-08-11 Surface Casing Operation Performed
2012-08-12 Direction Drilling Operation Performed - Horizontal
2012-08-15 Intermediate Casing Operation Performed
2012-08-15 Well Log Performed
2012-08-21 Finished Drilling
2012-08-21 Well Mode changed to Drilled and Cased
2012-08-23 Liner Casing Operation Performed
2012-08-23 Perforation Treatment Performed - Open-Hole Completion
2012-08-23 Rig Released
2012-10-01 Well Began Production
2012-10-01 Well Fluid changed to Crude Oil
2012-10-01 Well Mode changed to Pumping
2012-10-02 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-03 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-08-10 Ensign Drilling Inc. 544 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-08-12 1680.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-08-23 Open Hole/Barefoot Completion 3492.00 3497.00 0
2012-10-02 Multi-Stage Fracture 2892.00 2892.10 0
2012-10-02 Multi-Stage Fracture 2818.40 2818.50 0
2012-10-02 Multi-Stage Fracture 2747.40 2747.50 0
2012-10-02 Multi-Stage Fracture 2673.50 2673.60 0
2012-10-03 Multi-Stage Fracture 2614.10 2614.20 0
2012-10-03 Multi-Stage Fracture 2543.40 2543.50 0
2012-10-03 Multi-Stage Fracture 2470.00 2470.10 0
2012-10-03 Multi-Stage Fracture 2399.20 2399.30 0
2012-10-03 Multi-Stage Fracture 2325.20 2325.30 0
2012-10-03 Multi-Stage Fracture 2264.40 2264.50 0
2012-10-02 Multi-Stage Fracture 3437.90 3438.00 0
2012-10-03 Multi-Stage Fracture 2190.00 2190.10 0
2012-10-03 Multi-Stage Fracture 2143.80 2143.90 0
2012-10-02 Multi-Stage Fracture 3376.80 3376.90 0
2012-10-02 Multi-Stage Fracture 3304.20 3304.30 0
2012-10-02 Multi-Stage Fracture 3245.20 3245.30 0
2012-10-02 Multi-Stage Fracture 3172.40 3172.50 0
2012-10-02 Multi-Stage Fracture 3098.60 3098.70 0
2012-10-02 Multi-Stage Fracture 3025.40 3025.50 0
2012-10-02 Multi-Stage Fracture 2965.10 2965.20 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1734 0.0 0.0 0.0
2013 8614 0.0 0.0 0.0
2014 8533 0.0 0.0 0.0
2015 8044 0.0 0.0 0.0
2016 8469 0.0 0.0 0.0
2017 8711 0.0 0.0 0.0
2018 7745 0.0 0.0 0.0
2019 8368 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-23 No Incident Encountered 0.00 0.00
2012-10-08 No Incident Encountered 0.00 0.00

For data sources see[8]

References