X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0315031202000

Well Details

Well ID: 0315031202000
Loading map...
Location: 00/02-12-031-03W5/0
Location Alias: 00/02-12-31-03 W5M
Location Alias 2: 00/02-12-031-03 W5/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 5
Range: 03
Section: 12
County/Municipality: Mountain View County
Well Name: TRANSGLOBE HARME 2-12-31-3
Operator Name: TransGlobe Energy Corporation
License Number: 0445928
License Date: 2012-05-16
License Status: Issued
Spud Date: 2012-06-22
Final Drill Date: 2012-07-04
Well Total Depth: 3348.00 m
Surface Hole Latitude: 51.648577
Surface Hole Longitude: -114.299303

For data sources see[1][2]

Well History

Date Event
2012-05-16 Obtained License
2012-06-24 Surface Casing Operation Performed
2012-06-27 Direction Drilling Operation Performed - Deviate
2012-06-29 Direction Drilling Operation Performed - Horizontal
2012-06-29 Well Log Performed
2012-07-01 Intermediate Casing Operation Performed
2012-07-04 Finished Drilling
2012-07-04 Well Log Performed
2012-07-04 Well Mode changed to Drilled and Cased
2012-07-06 Liner Casing Operation Performed
2012-07-06 Perforation Treatment Performed - Open-Hole Completion
2012-07-07 Rig Released
2012-09-08 Well Log Performed
2012-09-09 Well Began Production
2012-09-09 Well Fluid changed to Crude Oil
2012-09-09 Well Mode changed to Pumping
2012-09-11 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-06-22 Canelson Drilling Inc. 20 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-06-27 1684.90 Deviate (5 - 79 degrees)
2012-06-29 2091.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-07-06 Open Hole/Barefoot Completion 3296.00 3348.00 0
2012-09-11 Multi-Stage Fracture 2753.40 2753.50 0
2012-09-11 Multi-Stage Fracture 2685.60 2685.70 0
2012-09-11 Multi-Stage Fracture 2618.00 2618.10 0
2012-09-11 Multi-Stage Fracture 2550.10 2550.20 0
2012-09-11 Multi-Stage Fracture 2471.30 2471.40 0
2012-09-11 Multi-Stage Fracture 2403.40 2403.50 0
2012-09-11 Multi-Stage Fracture 2336.10 2336.20 0
2012-09-11 Multi-Stage Fracture 2268.40 2268.50 0
2012-09-11 Multi-Stage Fracture 2213.60 2213.70 0
2012-09-11 Multi-Stage Fracture 3295.30 3295.40 0
2012-09-11 Multi-Stage Fracture 3240.80 3240.90 0
2012-09-11 Multi-Stage Fracture 3172.70 3172.80 0
2012-09-11 Multi-Stage Fracture 3104.60 3104.70 0
2012-09-11 Multi-Stage Fracture 3036.60 3036.70 0
2012-09-11 Multi-Stage Fracture 2971.60 2971.70 0
2012-09-11 Multi-Stage Fracture 2889.90 2890.00 0
2012-09-11 Multi-Stage Fracture 2821.50 2821.60 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2565 0.0 0.0 0.0
2013 8614 0.0 0.0 0.0
2014 8694 0.0 0.0 0.0
2015 8423 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8015 0.0 0.0 0.0
2018 7930 0.0 0.0 0.0
2019 8200 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-07-07 No Incident Encountered 0.00 0.00
2012-10-01 No Incident Encountered 0.00 0.00

For data sources see[8]

References