If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0315031103030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.648588,"lon":-114.319778,"icon":""}]} |
Location: 03/03-11-031-03W5/0 | |
Location Alias: 03/03-11-31-03 W5M | |
Location Alias 2: 03/03-11-031-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 031 | |
Meridian: 5 | |
Range: 03 | |
Section: 11 | |
County/Municipality: Mountain View County | |
Well Name: TRANSGLOBE HARME 3-11-31-3 | |
Operator Name: TransGlobe Energy Corporation | |
License Number: 0458366 | |
License Date: 2013-08-02 | |
License Status: Issued | |
Spud Date: 2013-08-18 | |
Final Drill Date: 2013-08-27 | |
Well Total Depth: 3342.00 m | |
Surface Hole Latitude: 51.648588 | |
Surface Hole Longitude: -114.319778 |
Date | Event |
---|---|
2013-08-02 | Obtained License |
2013-08-19 | Surface Casing Operation Performed |
2013-08-21 | Direction Drilling Operation Performed - Deviate |
2013-08-22 | Direction Drilling Operation Performed - Horizontal |
2013-08-22 | Well Log Performed |
2013-08-24 | Intermediate Casing Operation Performed |
2013-08-27 | Finished Drilling |
2013-08-27 | Well Log Performed |
2013-08-27 | Well Mode changed to Drilled and Cased |
2013-08-28 | Liner Casing Operation Performed |
2013-08-28 | Perforation Treatment Performed - Open-Hole Completion |
2013-08-29 | Rig Released |
2013-09-14 | Well Log Performed |
2013-09-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-09-28 | Well Began Production |
2013-09-28 | Well Fluid changed to Crude Oil |
2013-09-28 | Well Mode changed to Flowing |
2013-10-02 | Well Log Performed |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-08-18 | Precision Drilling Corporation | 377 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-08-21 | 1711.80 | Deviate (5 - 79 degrees) |
2013-08-22 | 2083.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-08-28 | Open Hole/Barefoot Completion | 3339.00 | 3342.00 | 0 |
2013-09-26 | Multi-Stage Fracture | 2827.90 | 2828.00 | 0 |
2013-09-26 | Multi-Stage Fracture | 2758.10 | 2758.20 | 0 |
2013-09-26 | Multi-Stage Fracture | 2703.50 | 2703.60 | 0 |
2013-09-26 | Multi-Stage Fracture | 2637.50 | 2637.60 | 0 |
2013-09-26 | Multi-Stage Fracture | 2584.40 | 2584.50 | 0 |
2013-09-26 | Multi-Stage Fracture | 2519.10 | 2519.20 | 0 |
2013-09-26 | Multi-Stage Fracture | 2453.50 | 2453.60 | 0 |
2013-09-26 | Multi-Stage Fracture | 2386.10 | 2386.20 | 0 |
2013-09-26 | Multi-Stage Fracture | 2333.10 | 2333.20 | 0 |
2013-09-26 | Multi-Stage Fracture | 2279.70 | 2279.80 | 0 |
2013-09-26 | Multi-Stage Fracture | 3329.00 | 3330.00 | 0 |
2013-09-26 | Multi-Stage Fracture | 2226.30 | 2226.40 | 0 |
2013-09-26 | Multi-Stage Fracture | 2159.00 | 2159.10 | 0 |
2013-09-26 | Multi-Stage Fracture | 3263.90 | 3264.00 | 0 |
2013-09-26 | Multi-Stage Fracture | 3207.40 | 3207.50 | 0 |
2013-09-26 | Multi-Stage Fracture | 3137.20 | 3137.30 | 0 |
2013-09-26 | Multi-Stage Fracture | 3080.50 | 3080.60 | 0 |
2013-09-26 | Multi-Stage Fracture | 3010.70 | 3010.80 | 0 |
2013-09-26 | Multi-Stage Fracture | 2954.80 | 2954.90 | 0 |
2013-09-26 | Multi-Stage Fracture | 2884.60 | 2884.70 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-09-26 | 2013-09-26 | 1,963 | 2,970 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 81.6503 | N/A | |||
FRAC SAND. 30/50 WHITE | Baker Hughes | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 6.6095 | N/A | ||
FRAC SAND. 40/70 WHITE | Baker Hughes | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 4.4106 | N/A | ||
FRAC SAND.70/140 OR 50/140 CANADIAN | Baker Hughes | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 0.5502 | N/A | ||
Breaker V | Baker Hughes | Breaker | Non-hazardous | Not Available | 100 | 0.0979 | N/A | |
Sodium hypochlorite | 7681-52-9 | 100 | 0.0979 | N/A | ||||
CC-2 | Baker Hughes | Clay Control | Non-hazardous | Not Available | 100 | 0.1648 | N/A | |
Nitrogen | Baker Hughes | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 6.3547 | N/A | |
FRW-31 | Baker Hughes | Friction Reducer | Distillates. hydrotreated middle. petroleum | 64742-46-7 | 100 | 0.0849 | N/A | |
Non-hazardous | Not Available | 100 | 0.0849 | N/A | ||||
InFlo 200 | Baker Hughes | Surfactant | Alcohol | 8648 | 100 | 0.0767 | N/A | |
Alkyl alkoxylate | 8648 | 100 | 0.0767 | N/A | ||||
Glycol | 8648 | 100 | 0.0767 | N/A | ||||
Terpene | 6896 | 100 | 0.0767 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-09-25 | 2013-09-25 | Recycled Fracturing Water (treated at well site) | 915 |
2013-09-25 | 2013-09-26 | Surface Water - Lake | 2580 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 1972 | 0.0 | 0.0 | 0.0 |
2014 | 8658 | 0.0 | 0.0 | 0.0 |
2015 | 8663 | 0.0 | 0.0 | 0.0 |
2016 | 8679 | 0.0 | 0.0 | 0.0 |
2017 | 7887 | 0.0 | 0.0 | 0.0 |
2018 | 7868 | 0.0 | 0.0 | 0.0 |
2019 | 7922 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-08-29 | No Incident Encountered | 0.00 | 0.00 |
2013-10-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]