X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0315031013020

Well Details

Well ID: 0315031013020
Loading map...
Location: 02/13-10-031-03W5/0
Location Alias: 02/13-10-31-03 W5M
Location Alias 2: 02/13-10-031-03 W5/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 5
Range: 03
Section: 10
County/Municipality: Mountain View County
Well Name: TRANSGLOBE HARME 13-10-31-3
Operator Name: TransGlobe Energy Corporation
License Number: 0443447
License Date: 2012-01-27
License Status: Amended
Spud Date: 2012-02-20
Final Drill Date: 2012-03-16
Well Total Depth: 3775.00 m
Surface Hole Latitude: 51.647786
Surface Hole Longitude: -114.331152

For data sources see[1][2]

Well History

Date Event
2012-01-27 Obtained License
2012-02-23 Surface Casing Operation Performed
2012-02-27 Direction Drilling Operation Performed - Horizontal
2012-03-04 Well Log Performed
2012-03-05 Intermediate Casing Operation Performed
2012-03-16 Finished Drilling
2012-03-16 Well Log Performed
2012-03-16 Well Mode changed to Drilled and Cased
2012-03-19 Liner Casing Operation Performed
2012-03-19 Perforation Treatment Performed - Open-Hole Completion
2012-03-20 Rig Released
2012-05-12 Well Log Performed
2012-05-15 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-15 Well Began Production
2012-05-15 Well Fluid changed to Gas
2012-05-15 Well Mode changed to Pumping
2012-05-17 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-18 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-19 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-22 Well Log Performed

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-20 Precision Drilling Corporation 633 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-27 2215.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-19 Open Hole/Barefoot Completion 3734.40 3775.00 0
2012-05-19 Multi-Stage Fracture 3034.80 3034.90 0
2012-05-19 Multi-Stage Fracture 2930.00 2930.10 0
2012-05-19 Multi-Stage Fracture 2799.30 2799.40 0
2012-05-19 Multi-Stage Fracture 2759.70 2759.80 0
2012-05-15 Multi-Stage Fracture 3733.70 3733.80 0
2012-05-15 Multi-Stage Fracture 3679.10 3679.20 0
2012-05-15 Multi-Stage Fracture 3610.50 3610.60 0
2012-05-17 Multi-Stage Fracture 3545.00 3545.10 0
2012-05-17 Multi-Stage Fracture 3388.30 3388.40 0
2012-05-18 Multi-Stage Fracture 3218.10 3218.20 0
2012-05-18 Multi-Stage Fracture 3165.60 3165.70 0
2012-05-19 Multi-Stage Fracture 3100.20 3100.30 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 5358 0.0 0.0 0.0
2013 8360 0.0 0.0 0.0
2014 7323 0.0 0.0 0.0
2015 8171 0.0 0.0 0.0
2016 8725 0.0 0.0 0.0
2017 8735 0.0 0.0 0.0
2018 8016 0.0 0.0 0.0
2019 7727 0.0 0.0 0.0
2020 1968 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-20 No Incident Encountered 0.00 0.00
2012-05-31 No Incident Encountered 0.00 0.00

For data sources see[8]

References