X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0315023415020

Well Details

Well ID: 0315023415020
Loading map...
Location: 02/15-34-031-02W5/0
Location Alias: 02/15-34-31-02 W5M
Location Alias 2: 02/15-34-031-02 W5/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 5
Range: 02
Section: 34
County/Municipality: Mountain View County
Well Name: TRANSGLOBE HARME 15-34-31-2
Operator Name: TransGlobe Energy Corporation
License Number: 0448483
License Date: 2012-09-14
License Status: Issued
Spud Date: 2012-09-23
Final Drill Date: 2012-10-09
Well Total Depth: 3667.00 m
Surface Hole Latitude: 51.694251
Surface Hole Longitude: -114.191673

For data sources see[1][2]

Well History

Date Event
2012-09-01 Well Log Performed
2012-09-14 Obtained License
2012-09-25 Surface Casing Operation Performed
2012-09-29 Direction Drilling Operation Performed - Deviate
2012-10-01 Direction Drilling Operation Performed - Horizontal
2012-10-02 Well Log Performed
2012-10-04 Intermediate Casing Operation Performed
2012-10-09 Finished Drilling
2012-10-09 Well Mode changed to Drilled and Cased
2012-10-11 Liner Casing Operation Performed
2012-10-11 Perforation Treatment Performed - Open-Hole Completion
2012-10-12 Rig Released
2012-10-19 Well Log Performed
2012-10-24 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-28 Well Began Production
2012-10-28 Well Fluid changed to Gas
2012-10-28 Well Mode changed to Flowing
2012-12-07 Well Fluid changed to Gas
2012-12-07 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-09-23 Canelson Drilling Inc. 20 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-09-29 2117.50 Deviate (5 - 79 degrees)
2012-10-01 2401.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-10-11 Open Hole/Barefoot Completion 3610.30 3667.00 0
2012-10-24 Multi-Stage Fracture 2844.80 2844.90 0
2012-10-24 Multi-Stage Fracture 2745.00 2745.10 0
2012-10-24 Multi-Stage Fracture 2644.00 2644.10 0
2012-10-24 Multi-Stage Fracture 2556.20 2556.30 0
2012-10-24 Multi-Stage Fracture 3609.60 3609.70 0
2012-10-24 Multi-Stage Fracture 3523.90 3524.00 0
2012-10-24 Multi-Stage Fracture 3434.20 3434.30 0
2012-10-24 Multi-Stage Fracture 3336.20 3336.30 0
2012-10-24 Multi-Stage Fracture 3235.50 3235.60 0
2012-10-24 Multi-Stage Fracture 3136.10 3136.20 0
2012-10-24 Multi-Stage Fracture 3035.90 3036.00 0
2012-10-24 Multi-Stage Fracture 2945.50 2945.60 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1523 0.0 0.0 0.0
2013 8341 0.0 0.0 0.0
2014 8653 0.0 0.0 0.0
2015 8155 0.0 0.0 0.0
2016 8753 0.0 0.0 0.0
2017 8735 0.0 0.0 0.0
2018 8207 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2135 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-12 No Incident Encountered 0.00 0.00
2012-11-02 No Incident Encountered 0.00 0.00

For data sources see[8]

References