X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0315022006000

Well Details

Well ID: 0315022006000
Loading map...
Location: 00/06-20-031-02W5/0
Location Alias: 00/06-20-31-02 W5M
Location Alias 2: 00/06-20-031-02 W5/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 5
Range: 02
Section: 20
County/Municipality: Mountain View County
Well Name: TRANSGLOBE GARR 6-20-31-2
Operator Name: TransGlobe Energy Corporation
License Number: 0419900
License Date: 2010-04-16
License Status: Issued
Spud Date: 2010-04-21
Final Drill Date: 2010-05-10
Well Total Depth: 3168.00 m
Surface Hole Latitude: 51.666059
Surface Hole Longitude: -114.239917

For data sources see[1][2]

Well History

Date Event
2010-04-16 Obtained License
2010-04-22 Surface Casing Operation Performed
2010-04-24 Well Log Performed
2010-04-28 Direction Drilling Operation Performed - Horizontal
2010-05-02 Intermediate Casing Operation Performed
2010-05-03 Well Log Performed
2010-05-10 Finished Drilling
2010-05-10 Well Mode changed to Drilled and Cased
2010-05-11 Perforation Treatment Performed - Open-Hole Completion
2010-05-13 Rig Released
2010-05-25 Liner Casing Operation Performed
2010-05-27 Perforation Treatment Performed - Multi-Stage Fracture
2010-05-28 Perforation Treatment Performed - Multi-Stage Fracture
2010-05-29 Perforation Treatment Performed - Multi-Stage Fracture
2010-06-01 Well Fluid changed to Crude Oil
2010-06-01 Well Mode changed to Drilling and Completing
2010-06-02 Well Log Performed
2010-07-23 Well Began Production
2010-07-23 Well Fluid changed to Crude Oil
2010-07-23 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-04-28 1830.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-05-11 Open Hole/Barefoot Completion 3143.00 3168.00 0
2010-05-29 Multi-Stage Fracture 2422.80 2422.90 0
2010-05-27 Multi-Stage Fracture 3125.70 3125.80 0
2010-05-27 Multi-Stage Fracture 3070.50 3070.60 0
2010-05-27 Multi-Stage Fracture 2967.40 2967.50 0
2010-05-28 Multi-Stage Fracture 2877.40 2877.50 0
2010-05-28 Multi-Stage Fracture 2786.80 2786.90 0
2010-05-28 Multi-Stage Fracture 2695.20 2695.30 0
2010-05-29 Multi-Stage Fracture 2604.30 2604.40 0
2010-05-29 Multi-Stage Fracture 2513.40 2513.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 3768 0.0 0.0 0.0
2011 8418 0.0 0.0 0.0
2012 8771 0.0 0.0 0.0
2013 8639 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 7367 0.0 0.0 0.0
2016 6742 0.0 0.0 0.0
2017 8735 0.0 0.0 0.0
2018 8039 0.0 0.0 0.0
2019 4752 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References