If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0315021901000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.67712,"lon":-114.26445,"icon":""}]} |
Location: 00/01-19-031-02W5/0 | |
Location Alias: 00/01-19-31-02 W5M | |
Location Alias 2: 00/01-19-031-02 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 031 | |
Meridian: 5 | |
Range: 02 | |
Section: 19 | |
County/Municipality: Mountain View County | |
Well Name: TRANSGLOBE GARR 1-19-31-2 | |
Operator Name: TransGlobe Energy Corporation | |
License Number: 0429597 | |
License Date: 2011-01-07 | |
License Status: Issued | |
Spud Date: 2011-01-28 | |
Final Drill Date: 2011-03-01 | |
Well Total Depth: 3550.00 m | |
Surface Hole Latitude: 51.677120 | |
Surface Hole Longitude: -114.264450 |
Date | Event |
---|---|
2011-01-07 | Obtained License |
2011-01-30 | Surface Casing Operation Performed |
2011-02-01 | Well Log Performed |
2011-02-05 | Direction Drilling Operation Performed - Horizontal |
2011-02-12 | Intermediate Casing Operation Performed |
2011-02-13 | Intermediate Casing Operation Performed |
2011-03-01 | Finished Drilling |
2011-03-01 | Well Mode changed to Drilled and Cased |
2011-03-02 | Well Log Performed |
2011-03-03 | Liner Casing Operation Performed |
2011-03-03 | Perforation Treatment Performed - Open-Hole Completion |
2011-03-05 | Rig Released |
2011-03-09 | Well Log Performed |
2011-03-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-04-08 | Well Began Production |
2011-04-08 | Well Fluid changed to Gas |
2011-04-08 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-02-05 | 2205.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-03-03 | Open Hole/Barefoot Completion | 3521.20 | 3550.00 | 0 |
2011-03-14 | Multi-Stage Fracture | 2712.00 | 2712.10 | 0 |
2011-03-14 | Multi-Stage Fracture | 2617.60 | 2617.70 | 0 |
2011-03-14 | Multi-Stage Fracture | 3521.20 | 3521.30 | 0 |
2011-03-14 | Multi-Stage Fracture | 3438.90 | 3439.00 | 0 |
2011-03-14 | Multi-Stage Fracture | 3330.60 | 3330.70 | 0 |
2011-03-14 | Multi-Stage Fracture | 3236.80 | 3236.90 | 0 |
2011-03-14 | Multi-Stage Fracture | 3129.50 | 3129.60 | 0 |
2011-03-14 | Multi-Stage Fracture | 3021.40 | 3021.50 | 0 |
2011-03-14 | Multi-Stage Fracture | 2913.80 | 2913.90 | 0 |
2011-03-14 | Multi-Stage Fracture | 2820.00 | 2820.10 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 5674 | 0.0 | 0.0 | 0.0 |
2012 | 8761 | 0.0 | 0.0 | 0.0 |
2013 | 8725 | 0.0 | 0.0 | 0.0 |
2014 | 8647 | 0.0 | 0.0 | 0.0 |
2015 | 8155 | 0.0 | 0.0 | 0.0 |
2016 | 8749 | 0.0 | 0.0 | 0.0 |
2017 | 8687 | 0.0 | 0.0 | 0.0 |
2018 | 8207 | 0.0 | 0.0 | 0.0 |
2019 | 8735 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]