X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0315011416022

Well Details

Well ID: 0315011416022
Loading map...
Location: 02/16-14-031-01W5/2
Location Alias: 02/16-14-31-01 W5M
Location Alias 2: 02/16-14-031-01 W5/02
Country: Canada
Province: Alberta
Township: 031
Meridian: 5
Range: 01
Section: 14
County/Municipality: Mountain View County
Well Name: VELVET HZ CROSSE 16-14-31-1
Operator Name: Velvet Energy Ltd.
License Number: 0458167
License Date: 2013-07-19
License Status: Suspension
Spud Date: 2013-07-29
Final Drill Date: 2013-08-23
Well Total Depth: 3774.00 m
Surface Hole Latitude: 51.648638
Surface Hole Longitude: -114.028128

For data sources see[1][2]

Well History

Date Event
2013-07-19 Obtained License
2013-08-01 Surface Casing Operation Performed
2013-08-10 Direction Drilling Operation Performed - Deviate
2013-08-15 Intermediate Casing Operation Performed
2013-08-16 Direction Drilling Operation Performed - Horizontal
2013-08-23 Finished Drilling
2013-08-23 Well Log Performed
2013-08-23 Well Mode changed to Drilled and Cased
2013-08-25 Liner Casing Operation Performed
2013-08-26 Rig Released
2013-08-31 Perforation Treatment Performed - Multi-Stage Fracture
2013-08-31 Perforation Treatment Performed - Open-Hole Completion
2013-09-01 Perforation Treatment Performed - Multi-Stage Fracture
2013-11-25 Well Began Production
2013-11-25 Well Fluid changed to Crude Oil
2013-11-25 Well Mode changed to Pumping
2016-03-01 Well Fluid changed to Crude Oil
2016-03-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2013-08-10 1886.00 Deviate (5 - 79 degrees)
2013-08-16 2292.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-08-31 Open Hole/Barefoot Completion 3770.00 3774.00 0
2013-08-31 Multi-Stage Fracture 2930.40 2930.50 0
2013-08-31 Multi-Stage Fracture 2830.40 2830.50 0
2013-09-01 Multi-Stage Fracture 2732.50 2732.60 0
2013-09-01 Multi-Stage Fracture 2620.90 2621.00 0
2013-09-01 Multi-Stage Fracture 2519.20 2519.30 0
2013-09-01 Multi-Stage Fracture 2418.40 2418.50 0
2013-08-31 Multi-Stage Fracture 3754.60 3754.70 0
2013-08-31 Multi-Stage Fracture 3648.40 3648.50 0
2013-08-31 Multi-Stage Fracture 3549.20 3549.30 0
2013-08-31 Multi-Stage Fracture 3451.10 3451.20 0
2013-08-31 Multi-Stage Fracture 3341.70 3341.80 0
2013-08-31 Multi-Stage Fracture 3244.50 3244.60 0
2013-08-31 Multi-Stage Fracture 3136.10 3136.20 0
2013-08-31 Multi-Stage Fracture 3038.70 3038.80 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-08-31 2013-09-01 2,201 1,278 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 49.3683 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 20.6435 N/A
50/140 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 1.0302 N/A
DWP-317 Calfrac Activator Alkyl Amine 8458 100 0.3086 N/A
Non-Hazardous Ingredients Trade Secret 100 0.3095 N/A
DWP-981 Calfrac Breaker Non-Hazardous Ingredients Trade Secret 100 0.0574 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 29.465 N/A
DWP-315 Calfrac Foamer 1.2.3-Propanetriol 56-81-5 100 0.1811 N/A
1.2-Ethanediol 107-21-1 100 0.1731 N/A
2.4-Pentanediol. 2-methyl- 107-41-5 100 0.1748 N/A
Amides. coco. N.N-bis(hydroxyethyl) 68603-42-9 100 0.1731 N/A
Ammonium Alkyl Ether Sulfate 68891-29-2 100 0.1729 N/A
Ethanol. 2.2'-iminobis- 111-42-2 100 0.1811 N/A
Non-Hazardous Ingredients Trade Secret 100 0.1731 N/A
DWP-321 Calfrac Gelling Agent Amides. coco. N.N-bis(hydroxyethyl) 68603-42-9 100 0.543 N/A
Non-Hazardous Ingredients Trade Secret 100 0.504 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-08-28 2013-08-29 Municipal Water 648
2013-08-28 2013-08-29 Municipal Water 1052

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 1440 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 2183 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-08-16 No Incident Encountered 0.00 0.00
2013-09-07 No Incident Encountered 0.00 0.00

For data sources see[9]

References