X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314281513000

Well Details

Well ID: 0314281513000
Loading map...
Location: 00/13-15-031-28W4/0
Location Alias: 00/13-15-31-28 W4M
Location Alias 2: 00/13-15-031-28 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 28
Section: 15
County/Municipality: Mountain View County
Well Name: TRANSGLOBE LPINECK 13-15-31-28
Operator Name: TransGlobe Energy Corporation
License Number: 0420196
License Date: 2010-04-30
License Status: Amended
Spud Date: 2010-05-18
Final Drill Date: 2010-06-06
Well Total Depth: 3581.00 m
Surface Hole Latitude: 51.656091
Surface Hole Longitude: -113.880506

For data sources see[1][2]

Well History

Date Event
2010-04-30 Obtained License
2010-05-19 Surface Casing Operation Performed
2010-05-23 Well Log Performed
2010-05-24 Direction Drilling Operation Performed - Horizontal
2010-05-31 Intermediate Casing Operation Performed
2010-06-01 Well Log Performed
2010-06-06 Finished Drilling
2010-06-06 Well Mode changed to Drilled and Cased
2010-06-09 Liner Casing Operation Performed
2010-06-09 Perforation Treatment Performed - Open-Hole Completion
2010-06-10 Rig Released
2010-06-29 Well Log Performed
2010-07-01 Well Fluid changed to Gas
2010-07-01 Well Mode changed to Drilling and Completing
2010-07-07 Perforation Treatment Performed - Multi-Stage Fracture
2010-09-30 Well Began Production
2010-09-30 Well Fluid changed to Gas
2010-09-30 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-05-24 2159.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-06-09 Open Hole/Barefoot Completion 3550.00 3581.00 0
2010-07-07 Multi-Stage Fracture 2654.00 2654.10 0
2010-07-07 Multi-Stage Fracture 3545.50 3545.60 0
2010-07-07 Multi-Stage Fracture 3462.90 3463.00 0
2010-07-07 Multi-Stage Fracture 3344.50 3344.60 0
2010-07-07 Multi-Stage Fracture 3227.20 3227.30 0
2010-07-07 Multi-Stage Fracture 3106.00 3106.10 0
2010-07-07 Multi-Stage Fracture 3001.70 3001.80 0
2010-07-07 Multi-Stage Fracture 2881.70 2881.80 0
2010-07-07 Multi-Stage Fracture 2761.30 2761.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 2213 0.0 0.0 0.0
2011 8589 0.0 0.0 0.0
2012 8539 0.0 0.0 0.0
2013 8657 0.0 0.0 0.0
2014 8601 0.0 0.0 0.0
2015 8348 0.0 0.0 0.0
2016 7904 0.0 0.0 0.0
2017 7775 0.0 0.0 0.0
2018 3647 0.0 0.0 0.0
2019 1440 0.0 0.0 0.0

For data sources see[6]

References