X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314270207020

Well Details

Well ID: 0314270207020
Loading map...
Location: 02/07-02-031-27W4/0
Location Alias: 02/07-02-31-27 W4M
Location Alias 2: 02/07-02-031-27 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 27
Section: 02
County/Municipality: Mountain View County
Well Name: EMBER 102 LPINECK 7-2-31-27
Operator Name: Ember Resources Inc.
License Number: 0115794
License Date: 1985-07-03
License Status: Amended
Spud Date: 1985-08-05
Final Drill Date: 1985-08-20
Well Total Depth: 2015.00 m
Surface Hole Latitude: 51.626128
Surface Hole Longitude: -113.722228

For data sources see[1][2]

Well History

Date Event
1985-07-03 Obtained License
1985-08-06 Surface Casing Operation Performed
1985-08-14 Drill Stem Test Performed
1985-08-15 Drill Stem Test Performed
1985-08-18 Drill Stem Test Performed
1985-08-20 Finished Drilling
1985-08-20 Well Log Performed
1985-08-21 Drill Stem Test Performed
1985-08-22 Drill Stem Test Performed
1985-08-23 Production Casing Operation Performed
1985-08-24 Rig Released
1985-09-11 Perforation Treatment Performed - Jet Perforation
1985-09-11 Well Log Performed
1985-09-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-09-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-09-13 Plug Back Performed
1985-09-14 Perforation Treatment Performed - Jet Perforation
1985-09-14 Well Log Performed
1985-09-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-09-17 Perforation Treatment Performed - Fractured
1985-09-23 Well Mode changed to Drilled and Cased
1988-10-01 Well Began Production
1988-10-01 Well Fluid changed to Gas
1988-10-01 Well Mode changed to Flowing
2013-03-25 Well Fluid changed to Gas
2013-03-25 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-09-11 Perforation 1986.00 1988.50 13
1985-09-11 Perforation 1991.50 1996.00 13
1985-09-12 Acid Treatment 1986.00 1996.00 0
1985-09-13 Packing Device Capped w/Cement 1976.00 1984.00 0
1985-09-14 Perforation 1661.00 1667.00 13
1985-09-14 Perforation 1669.00 1670.00 14
1985-09-14 Perforation 1671.00 1672.00 14
1985-09-15 Acid Treatment 1661.00 1672.00 0
1985-09-17 Fracture 1661.00 1672.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 1642 0.0 0.0 0.0
1989 8045 0.0 0.0 0.0
1990 7693 0.0 0.0 0.0
1991 7919 0.0 0.0 0.0
1992 8075 0.0 0.0 0.0
1993 8509 0.0 0.0 0.0
1994 8758 0.0 0.0 0.0
1995 8756 0.0 0.0 0.0
1996 8781 0.0 0.0 0.0
1997 6519 0.0 0.0 0.0
1998 8613 0.0 0.0 0.0
1999 8619 0.0 0.0 0.0
2000 8539 0.0 0.0 0.0
2001 8536 0.0 0.0 0.0
2002 8647 0.0 0.0 0.0
2003 8614 0.0 0.0 0.0
2004 8587 0.0 0.0 0.0
2005 8705 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 6811 0.0 0.0 0.0
2011 6706 0.0 0.0 0.0
2012 7389 0.0 0.0 0.0
2013 7557 0.0 0.0 0.0
2014 8496 0.0 0.0 0.0
2015 7173 0.0 0.0 0.0
2016 5596 0.0 0.0 0.0
2017 4468 0.0 0.0 0.0
2018 2552 0.0 0.0 0.0
2019 5461 0.0 0.0 0.0
2020 2161 0.0 0.0 0.0

For data sources see[5]

References