X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314260911020

Well Details

Well ID: 0314260911020
Loading map...
Location: 02/11-09-031-26W4/0
Location Alias: 02/11-09-31-26 W4M
Location Alias 2: 02/11-09-031-26 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 26
Section: 09
County/Municipality: Mountain View County
Well Name: HURON RES HZ 102 WORKMAN 11-9-31-26
Operator Name: Huron Resources Corp.
License Number: 0492289
License Date: 2018-11-26
License Status: Issued
Spud Date: 2018-12-08
Final Drill Date: 2018-12-30
Well Total Depth: 4800.00 m
Surface Hole Latitude: 51.664283
Surface Hole Longitude: -113.653959

For data sources see[1][2]

Well History

Date Event
2018-11-26 Obtained License
2018-12-09 Surface Casing Operation Performed
2018-12-12 Direction Drilling Operation Performed - Deviate
2018-12-15 Direction Drilling Operation Performed - Horizontal
2018-12-30 Finished Drilling
2018-12-30 Well Log Performed
2018-12-30 Well Mode changed to Drilled and Cased
2018-12-31 Production Casing Operation Performed
2019-01-02 Rig Released
2019-03-12 Perforation Treatment Performed - Jet Perforation
2019-03-12 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-13 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-14 Perforation Treatment Performed - Jet Perforation
2019-03-14 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-15 Perforation Treatment Performed - Jet Perforation
2019-03-15 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-16 Perforation Treatment Performed - Jet Perforation
2019-03-16 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-17 Well Fluid changed to Crude Oil
2019-03-17 Well Mode changed to Drilling and Completing
2019-04-26 Well Began Production
2019-04-26 Well Fluid changed to Crude Oil
2019-04-26 Well Mode changed to Flowing
2019-09-21 Well Fluid changed to Crude Oil
2019-09-21 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-12-08 Ironhand Drilling Inc. 7 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-12-12 1870.00 Deviate (5 - 79 degrees)
2018-12-15 2319.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-03-12 Multi-Stage Fracture 4743.10 4757.30 0
2019-03-15 Perforation 4208.00 4209.00 12
2019-03-15 Multi-Stage Fracture 4208.00 4250.20 0
2019-03-15 Perforation 4125.60 4126.60 12
2019-03-15 Perforation 4084.50 4085.50 12
2019-03-15 Multi-Stage Fracture 4084.50 4126.60 0
2019-03-15 Perforation 4002.10 4003.10 12
2019-03-15 Perforation 3960.90 3961.90 12
2019-03-15 Multi-Stage Fracture 3960.90 4003.10 0
2019-03-15 Perforation 3886.20 3887.20 12
2019-03-15 Perforation 3855.50 3856.50 12
2019-03-12 Perforation 4616.80 4617.80 20
2019-03-15 Perforation 3824.90 3825.90 12
2019-03-15 Multi-Stage Fracture 3824.90 3887.20 0
2019-03-15 Perforation 3689.00 3690.00 12
2019-03-15 Perforation 3726.00 3727.00 12
2019-03-15 Perforation 3763.70 3764.70 12
2019-03-15 Multi-Stage Fracture 3689.00 3764.70 0
2019-03-15 Perforation 3590.30 3591.30 12
2019-03-15 Perforation 3631.50 3632.50 12
2019-03-15 Multi-Stage Fracture 3590.30 3632.50 0
2019-03-15 Perforation 3482.90 3483.90 12
2019-03-12 Multi-Stage Fracture 4616.80 4617.80 0
2019-03-15 Perforation 3485.90 3486.90 12
2019-03-16 Multi-Stage Fracture 3482.90 3486.90 0
2019-03-16 Perforation 3343.30 3344.30 12
2019-03-16 Perforation 3384.40 3385.40 12
2019-03-16 Multi-Stage Fracture 3343.30 3385.40 0
2019-03-16 Perforation 3220.00 3221.00 12
2019-03-16 Perforation 3261.00 3262.00 12
2019-03-16 Multi-Stage Fracture 3220.00 3262.00 0
2019-03-16 Perforation 3096.00 3097.00 12
2019-03-16 Perforation 3137.00 3138.00 12
2019-03-12 Perforation 4491.10 4492.10 20
2019-03-16 Multi-Stage Fracture 3096.00 3138.00 0
2019-03-16 Perforation 3013.80 3014.80 12
2019-03-16 Perforation 2972.70 2973.70 12
2019-03-16 Multi-Stage Fracture 2972.70 3014.80 0
2019-03-16 Perforation 2890.30 2891.30 12
2019-03-16 Perforation 2849.10 2850.10 12
2019-03-16 Multi-Stage Fracture 2849.10 2891.30 0
2019-03-16 Perforation 2766.80 2767.80 12
2019-03-16 Perforation 2725.60 2726.60 12
2019-03-16 Multi-Stage Fracture 2725.60 2767.80 0
2019-03-13 Multi-Stage Fracture 4491.10 4492.10 0
2019-03-16 Perforation 2606.30 2607.30 12
2019-03-16 Perforation 2603.30 2604.30 12
2019-03-16 Multi-Stage Fracture 2603.30 2607.30 0
2019-03-16 Perforation 2480.70 2481.70 12
2019-03-16 Perforation 2477.00 2478.00 12
2019-03-16 Multi-Stage Fracture 2477.00 2481.70 0
2019-03-16 Perforation 2355.00 2356.00 12
2019-03-16 Perforation 2352.00 2353.00 12
2019-03-16 Multi-Stage Fracture 2352.00 2356.00 0
2019-03-14 Perforation 4372.70 4373.70 12
2019-03-14 Perforation 4331.50 4332.50 12
2019-03-14 Multi-Stage Fracture 4331.50 4492.10 0
2019-03-15 Perforation 4249.20 4250.20 12

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-03-12 2019-03-16 2,199 3,365 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 hydrochloric acid 7647-01-0 100 17.8076 N/A
water Not Available 100 43.2684 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0064 N/A
dibromoacetonitrile 3252-43-5 100 0.0064 N/A
non-hazardous ingredients Not Available 100 0.0064 N/A
polyethylene glycol 25322-68-3 100 0.0064 N/A
sodium bromide 7647-15-6 100 0.0064 N/A
pH- 2 Trican Buffer acetic acid 64-19-7 100 1.8026 N/A
water Not Available 100 1.8026 N/A
CC-10 Trican Clay Control non-hazardous ingredients Not Available 100 0.0125 N/A
AI-11 Trican Corrosion Inhibitor non-hazardous ingredients Not Available 100 0.0222 N/A
potassium iodide 7681-11-0 100 0.0222 N/A
propargyl alcohol 107-19-7 100 0.0222 N/A
propargyl alcohol derivative 38172-91-7 100 0.0222 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0214 N/A
propylene glycol 57-55-6 100 0.0214 N/A
FR-1s Trican Friction Reducer non-hazardous ingredients Not Available 100 0.0556 N/A
IC-3 Trican Iron Control sodium nitrilo-triacetate. monohydrate 18662-53-8 100 0.0444 N/A
SI-10 Scale Inhibitor Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0252 N/A
ASA-31 Trican Surfactant amines. tallow alkyl. ethoxylated 61791-26-2 100 0.1226 N/A
dipropylene glycol monomethyl ether 34590-94-8 100 0.1226 N/A
isopropanol 67-63-0 100 0.1226 N/A
quat. ammonium compounds. dicoco alkyldimethyl. chorides 61789-77-3 100 0.1226 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-03-04 2019-03-09 Central Water Distribution Facility 263
2019-03-03 2019-03-12 Central Water Distribution Facility 1339
2019-03-04 2019-03-14 Municipal Water 510
2019-02-22 2019-03-15 Municipal Water 542
2019-02-22 2019-03-09 Municipal Water 492
2019-03-03 2019-03-16 Municipal Water 415

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 5395 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-12-30 No Incident Encountered 0.00 0.00
2019-03-22 No Incident Encountered 0.00 0.00

For data sources see[10]

References