X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314252306000

Well Details

Well ID: 0314252306000
Loading map...
Location: 00/06-23-031-25W4/0
Location Alias: 00/06-23-31-25 W4M
Location Alias 2: 00/06-23-031-25 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 25
Section: 23
County/Municipality: Kneehill County
Well Name: ARGYLL ET AL TWINING 6-23-31-25
Operator Name: Obsidian Energy Ltd.
License Number: 0131758
License Date: 1988-01-28
License Status: RecCertified
Spud Date: 1988-02-06
Final Drill Date: 1988-02-18
Well Total Depth: 1795.00 m
Surface Hole Latitude: 51.669633
Surface Hole Longitude: -113.446228

For data sources see[1][2]

Well History

Date Event
1988-01-28 Obtained License
1988-02-07 Surface Casing Operation Performed
1988-02-18 Finished Drilling
1988-02-18 Well Log Performed
1988-02-18 Well Mode changed to Drilled and Cased
1988-02-19 Drill Stem Test Performed
1988-02-20 Production Casing Operation Performed
1988-02-21 Rig Released
1988-02-25 Well Log Performed
1988-02-26 Well Log Performed
1988-02-27 Perforation Treatment Performed - Jet Perforation
1988-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-02-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-02-29 Plug Back Performed
1988-02-29 Well Log Performed
1988-03-01 Perforation Treatment Performed - Jet Perforation
1988-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-11 Well Began Production
1988-03-11 Well Fluid changed to Crude Oil
1988-03-11 Well Mode changed to Pumping
1988-04-26 Perforation Treatment Performed - Jet Perforation
1988-04-26 Well Log Performed
1988-04-27 Perforation Treatment Performed - Fractured
1993-07-31 Well Fluid changed to Crude Oil
1993-07-31 Well Mode changed to Suspended
1994-11-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-11-02 Perforation Treatment Performed - Jet Perforation
1994-11-02 Plug Back Performed
1994-11-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-11-03 Perforation Treatment Performed - Remedial Casing
1994-11-03 Well Fluid changed to Crude Oil
1994-11-03 Well Mode changed to Abandoned
1994-11-04 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-02-27 Perforation 1751.50 1753.50 13
1988-04-27 Fracture 1720.00 1742.00 0
1994-11-02 Packing Device Capped w/Cement 1702.00 1710.00 0
1994-11-02 Perforation 320.00 321.00 10
1994-11-03 Remedial Casing Cementing 320.00 321.00 0
1994-11-03 Packing Device Capped w/Cement 270.00 315.00 0
1988-02-27 Perforation 1768.00 1770.00 13
1988-02-28 Acid Treatment 1751.50 1770.00 0
1988-02-29 Packing Device Capped w/Cement 1749.50 1749.50 0
1988-03-01 Perforation 1720.00 1722.00 13
1988-03-01 Perforation 1728.00 1731.50 13
1988-03-01 Perforation 1741.00 1742.00 13
1988-03-02 Acid Treatment 1720.00 1742.00 0
1988-04-26 Perforation 1731.50 1735.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 6214 0.0 0.0 0.0
1989 7367 0.0 0.0 0.0
1990 3972 0.0 0.0 0.0
1991 5999 0.0 0.0 0.0

For data sources see[5]

References