X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314251810000

Well Details

Well ID: 0314251810000
Loading map...
Location: 00/10-18-031-25W4/0
Location Alias: 00/10-18-31-25 W4M
Location Alias 2: 00/10-18-031-25 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 25
Section: 18
County/Municipality: Kneehill County
Well Name: LONG RUN TWINING 10-18-31-25
Operator Name: Long Run Exploration Ltd.
License Number: 0062069
License Date: 1977-01-12
License Status: Abandoned
Spud Date: 1977-01-12
Final Drill Date: 1977-01-25
Well Total Depth: 1853.20 m
Surface Hole Latitude: 51.659456
Surface Hole Longitude: -113.530958

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-01-12 Obtained License
1977-01-17 Drill Stem Test Performed
1977-01-21 Drill Stem Test Performed
1977-01-25 Finished Drilling
1977-01-28 Production Casing Operation Performed
1977-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-02-17 Perforation Treatment Performed - Jet Perforation
1977-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-03-12 Well Mode changed to Drilled and Cased
1979-08-07 Perforation Treatment Performed - Cement Squeeze
1979-08-09 Perforation Treatment Performed - Jet Perforation
1979-08-09 Well Mode changed to Abandoned Zone
1992-10-09 Perforation Treatment Performed - Fractured
2004-07-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-07-13 Plug Back Performed
2004-07-14 Perforation Treatment Performed - Jet Perforation
2004-07-14 Well Log Performed
2004-07-16 Perforation Treatment Performed - Fractured
2005-05-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-05-15 Plug Back Performed
2005-05-15 Well Log Performed
2005-05-16 Perforation Treatment Performed - Jet Perforation
2005-05-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-05-17 Perforation Treatment Performed - Jet Perforation
2005-05-17 Perforation Treatment Performed - Remedial Casing
2005-05-17 Plug Back Performed
2005-05-17 Well Log Performed
2005-05-18 Perforation Treatment Performed - Remedial Casing
2005-05-19 Well Log Performed
2005-05-23 Perforation Treatment Performed - Jet Perforation
2005-05-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-05-24 Plug Back Performed
2005-05-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-05-25 Perforation Treatment Performed - Jet Perforation
2005-05-25 Perforation Treatment Performed - Remedial Casing
2005-05-25 Plug Back Performed
2005-05-25 Well Log Performed
2005-05-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-05-26 Perforation Treatment Performed - Jet Perforation
2005-05-26 Perforation Treatment Performed - Remedial Casing
2005-05-26 Plug Back Performed
2005-05-26 Well Abandoned
2005-05-26 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-02-17 Perforation 1792.50 1799.80 7
2005-05-15 Packing Device Capped w/Cement 1537.00 1545.00 0
2005-05-15 Packing Device Capped w/Cement 1717.00 1725.00 0
2005-05-16 Perforation 1001.00 1002.00 17
2005-05-16 Perforation 814.00 815.00 17
2005-05-17 Remedial Casing Cementing 814.00 1002.00 0
2005-05-17 Packing Device Capped w/Cement 802.00 810.00 0
2005-05-17 Packing Device Capped w/Cement 985.00 995.00 0
2005-05-17 Perforation 756.00 757.00 14
2005-05-17 Perforation 699.00 700.00 17
2005-05-18 Remedial Casing Cementing 756.00 757.00 0
1977-02-17 Acid Treatment 1792.50 1799.80 0
2005-05-23 Perforation 726.00 727.00 17
2005-05-23 Perforation 723.30 724.80 17
2005-05-24 Packing Device Capped w/Cement 742.00 750.00 0
2005-05-25 Packing Device Capped w/Cement 709.00 717.00 0
2005-05-25 Remedial Casing Cementing 699.00 700.00 0
2005-05-25 Packing Device Capped w/Cement 685.00 695.00 0
2005-05-25 Perforation 651.00 652.00 17
2005-05-25 Perforation 530.00 531.00 17
2005-05-25 Remedial Casing Cementing 530.00 652.00 0
2005-05-25 Packing Device Capped w/Cement 633.00 641.00 0
1977-02-24 Acid Treatment 1792.50 1799.80 0
2005-05-26 Packing Device Capped w/Cement 514.00 522.00 0
2005-05-26 Perforation 430.00 431.00 17
2005-05-26 Remedial Casing Cementing 430.00 431.00 0
2005-05-26 Packing Device Capped w/Cement 415.00 425.00 0
1979-08-07 Cement Squeeze 1792.50 1799.80 0
1979-08-09 Perforation 1553.30 1556.30 13
1992-10-09 Fracture 1553.30 1556.30 0
2004-07-13 Packing Device Capped w/Cement 1771.00 1779.00 0
2004-07-14 Perforation 1733.00 1734.60 17
2004-07-16 Fracture 1733.00 1734.60 0

For data sources see[4]



References