X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314201304002

Well Details

Well ID: 0314201304002
Loading map...
Location: 00/04-13-031-20W4/2
Location Alias: 00/04-13-31-20 W4M
Location Alias 2: 00/04-13-031-20 W4/02
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 20
Section: 13
County/Municipality: Starland County
Well Name: TEAC WAYNE 4-13-31-20
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0140101
License Date: 1989-06-09
License Status: Issued
Spud Date: 1989-06-26
Final Drill Date: 1989-07-01
Well Total Depth: 1421.00 m
Surface Hole Latitude: 51.652007
Surface Hole Longitude: -112.716622

For data sources see[1][2]

Well History

Date Event
1989-06-09 Obtained License
1989-06-27 Surface Casing Operation Performed
1989-07-01 Finished Drilling
1989-07-01 Well Log Performed
1989-07-01 Well Mode changed to Drilled and Cased
1989-07-02 Production Casing Operation Performed
1989-07-02 Rig Released
1989-07-06 Perforation Treatment Performed - Jet Perforation
1989-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-07-12 Perforation Treatment Performed - Fractured
1989-10-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-10-17 Perforation Treatment Performed - Jet Perforation
1989-10-17 Plug Back Performed
1989-10-18 Perforation Treatment Performed - Fractured
1989-11-14 Well Began Production
1989-11-14 Well Fluid changed to Gas
1989-11-14 Well Mode changed to Flowing
1990-12-12 Perforation Treatment Performed - Jet Perforation
1990-12-15 Perforation Treatment Performed - Fractured
2019-03-01 Well Fluid changed to Gas
2019-03-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-07-06 Perforation 1381.00 1384.00 13
1989-07-07 Acid Treatment 1381.00 1384.00 0
1989-07-12 Fracture 1381.00 1384.00 0
1989-10-17 Packing Device Capped w/Cement 1370.00 1378.00 0
1989-10-17 Perforation 1333.00 1336.00 13
1989-10-18 Fracture 1333.00 1336.00 0
1990-12-12 Perforation 1320.00 1322.00 13
1990-12-15 Fracture 1320.00 1322.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 1111 0.0 0.0 0.0
1990 7744 0.0 0.0 0.0
1991 7715 0.0 0.0 0.0
1992 8517 0.0 0.0 0.0
1993 8570 0.0 0.0 0.0
1994 8565 0.0 0.0 0.0
1995 7937 0.0 0.0 0.0
1996 8720 0.0 0.0 0.0
1997 8588 0.0 0.0 0.0
1998 8516 0.0 0.0 0.0
1999 8375 0.0 0.0 0.0
2000 8481 0.0 0.0 0.0
2001 8253 0.0 0.0 0.0
2002 7866 0.0 0.0 0.0
2003 8375 0.0 0.0 0.0
2004 8735 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8713 0.0 0.0 0.0
2009 8714 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8708 0.0 0.0 0.0
2012 8701 0.0 0.0 0.0
2013 8689 0.0 0.0 0.0
2014 8039 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 2879 0.0 0.0 0.0

For data sources see[5]

References