X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314200307000

Well Details

Well ID: 0314200307000
Loading map...
Location: 00/07-03-031-20W4/0
Location Alias: 00/07-03-31-20 W4M
Location Alias 2: 00/07-03-031-20 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 20
Section: 03
County/Municipality: Starland County
Well Name: CEC ET AL MORRIN 7-3-31-20
Operator Name: TAQA North Ltd.
License Number: 0022162
License Date: 1962-02-27
License Status: RecCertified
Spud Date: 1962-03-20
Final Drill Date: 1962-04-18
Well Total Depth: 2214.10 m
Surface Hole Latitude: 51.625259
Surface Hole Longitude: -112.754104

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-02-27 Obtained License
1962-03-27 Drill Stem Test Performed
1962-04-04 Drill Stem Test Performed
1962-04-06 Drill Stem Test Performed
1962-04-15 Drill Stem Test Performed
1962-04-18 Finished Drilling
1962-04-25 Drill Stem Test Performed
1962-04-26 Drill Stem Test Performed
1962-04-27 Production Casing Operation Performed
1962-05-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-05-08 Perforation Treatment Performed - Jet Perforation
1962-05-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-06-20 Well Mode changed to Drilled and Cased
1967-11-13 Well Began Production
1967-11-13 Well Fluid changed to Gas
1967-11-13 Well Mode changed to Flowing
1991-03-07 Well Log Performed
1991-03-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-03-08 Perforation Treatment Performed - Jet Perforation
1991-03-08 Plug Back Performed
1991-03-09 Perforation Treatment Performed - Jet Perforation
1991-03-09 Well Log Performed
1991-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-03-10 Well Log Performed
1991-03-13 Perforation Treatment Performed - Jet Perforation
1991-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-03-14 Well Log Performed
1991-03-15 Well Log Performed
1991-03-16 Perforation Treatment Performed - Jet Perforation
1991-03-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-03-18 Perforation Treatment Performed - Fractured
1991-06-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-06-07 Plug Back Performed
1991-06-07 Well Fluid changed to Gas
1991-06-07 Well Mode changed to Abandoned
1991-06-10 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-05-08 Perforation 1387.40 1389.00 13
1991-03-14 Acid Treatment 1354.20 1360.00 0
1991-03-16 Perforation 1339.20 1341.00 13
1991-03-16 Perforation 1342.80 1345.30 13
1991-03-17 Acid Treatment 1339.20 1345.30 0
1991-03-18 Fracture 1339.20 1345.30 0
1991-06-07 Packing Device Capped w/Cement 1351.00 1351.00 0
1962-05-08 Acid Treatment 1387.40 1389.00 0
1962-05-09 Acid Treatment 1387.40 1389.00 0
1991-03-08 Packing Device Capped w/Cement 1377.00 1385.00 0
1991-03-08 Perforation 1368.50 1370.20 13
1991-03-09 Perforation 1368.70 1370.40 13
1991-03-10 Acid Treatment 1368.50 1370.40 0
1991-03-13 Perforation 1354.20 1355.40 13
1991-03-13 Perforation 1357.00 1360.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 43 0.0 0.0 0.0
1971 26 0.0 0.0 0.0
1972 1215 0.0 0.0 0.0
1974 436 0.0 0.0 0.0
1978 640 0.0 0.0 0.0
1979 698 0.0 0.0 0.0
1980 2612 0.0 0.0 0.0
1981 3332 0.0 0.0 0.0
1982 1341 0.0 0.0 0.0
1985 1388 0.0 0.0 0.0
1986 2855 0.0 0.0 0.0

For data sources see[5]

References