X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314190704000

Well Details

Well ID: 0314190704000
Loading map...
Location: 00/04-07-031-19W4/0
Location Alias: 00/04-07-31-19 W4M
Location Alias 2: 00/04-07-031-19 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 19
Section: 07
County/Municipality: Starland County
Well Name: TEAC WAYNE 4-7-31-19
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0138356
License Date: 1989-01-20
License Status: Suspension
Spud Date: 1989-01-26
Final Drill Date: 1989-01-31
Well Total Depth: 1375.00 m
Surface Hole Latitude: 51.637391
Surface Hole Longitude: -112.693051

For data sources see[1][2]

Well History

Date Event
1989-01-20 Obtained License
1989-01-27 Surface Casing Operation Performed
1989-01-31 Finished Drilling
1989-01-31 Well Mode changed to Drilled and Cased
1989-02-01 Well Log Performed
1989-02-02 Production Casing Operation Performed
1989-02-02 Rig Released
1989-02-14 Perforation Treatment Performed - Jet Perforation
1989-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-02-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-02-17 Perforation Treatment Performed - Jet Perforation
1989-02-17 Plug Back Performed
1989-02-18 Perforation Treatment Performed - Fractured
1989-05-15 Well Began Production
1989-05-15 Well Fluid changed to Gas
1989-05-15 Well Mode changed to Flowing
2011-07-28 Well Fluid changed to Gas
2011-07-28 Well Mode changed to Suspended
2011-08-17 Well Fluid changed to Gas
2011-08-17 Well Mode changed to Flowing
2015-04-30 Well Fluid changed to Gas
2015-04-30 Well Mode changed to Suspended
2018-12-17 Well Fluid changed to Coalbed Methane-Coals Only
2018-12-17 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-02-14 Perforation 1353.00 1355.00 13
1989-02-15 Acid Treatment 1353.00 1355.00 0
1989-02-17 Packing Device Capped w/Cement 1342.00 1350.00 0
1989-02-17 Perforation 1309.00 1315.00 13
1989-02-18 Fracture 1309.00 1315.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 5415 0.0 0.0 0.0
1990 8485 0.0 0.0 0.0
1991 8605 0.0 0.0 0.0
1992 8617 0.0 0.0 0.0
1993 8669 0.0 0.0 0.0
1994 8665 0.0 0.0 0.0
1995 8074 0.0 0.0 0.0
1996 8751 0.0 0.0 0.0
1997 8709 0.0 0.0 0.0
1998 8689 0.0 0.0 0.0
1999 8679 0.0 0.0 0.0
2000 8731 0.0 0.0 0.0
2001 8622 0.0 0.0 0.0
2002 8646 0.0 0.0 0.0
2003 8680 0.0 0.0 0.0
2004 8717 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8405 0.0 0.0 0.0
2008 8425 0.0 0.0 0.0
2009 6666 0.0 0.0 0.0
2010 1071 0.0 0.0 0.0
2011 3272 0.0 0.0 0.0
2012 7284 0.0 0.0 0.0
2013 1370 0.0 0.0 0.0
2018 528 0.0 0.0 0.0
2019 744 0.0 0.0 0.0

For data sources see[5]

References