X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314182206002

Well Details

Well ID: 0314182206002
Loading map...
Location: 00/06-22-031-18W4/2
Location Alias: 00/06-22-31-18 W4M
Location Alias 2: 00/06-22-031-18 W4/02
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 18
Section: 22
County/Municipality: Starland County
Well Name: HUNT GARTLEY 6-22-31-18
Operator Name: Hunt Oil Company
License Number: 0092332
License Date: 1981-09-22
License Status: Re-Entered
Spud Date: 1981-09-24
Final Drill Date: 1981-09-30
Well Total Depth: 1355.00 m
Surface Hole Latitude: 51.670250
Surface Hole Longitude: -112.474384

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-09-22 Obtained License
1981-09-27 Drill Stem Test Performed
1981-09-30 Drill Stem Test Performed
1981-09-30 Finished Drilling
1981-09-30 Well Log Performed
1981-09-30 Well Mode changed to Drilled and Cased
1981-10-01 Drill Stem Test Performed
1981-10-02 Production Casing Operation Performed
1981-11-17 Perforation Treatment Performed - Jet Perforation
1981-11-19 Perforation Treatment Performed - Jet Perforation
1990-09-06 Perforation Treatment Performed - Jet Perforation
1991-12-01 Well Began Production
1991-12-01 Well Fluid changed to Gas
1991-12-01 Well Mode changed to Flowing
1993-08-15 Well Fluid changed to Gas
1993-08-15 Well Mode changed to Suspended
1996-10-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-20 Perforation Treatment Performed - Jet Perforation
1996-10-20 Plug Back Performed
1996-10-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-21 Perforation Treatment Performed - Remedial Casing
1996-10-23 Well Abandoned
1996-10-23 Well Fluid changed to Gas
1996-10-23 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-11-17 Perforation 1317.00 1319.50 13
1981-11-19 Perforation 1317.00 1319.50 0
1990-09-06 Perforation 1299.50 1302.00 13
1996-10-20 Packing Device Capped w/Cement 1280.00 1288.00 0
1996-10-20 Perforation 304.00 304.50 10
1996-10-21 Remedial Casing Cementing 304.00 304.50 0
1996-10-21 Packing Device Capped w/Cement 327.50 327.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 731 0.0 0.0 0.0
1992 8406 0.0 0.0 0.0
1993 3842 0.0 0.0 0.0

For data sources see[5]

References