X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314180106020

Well Details

Well ID: 0314180106020
Loading map...
Location: 02/06-01-031-18W4/0
Location Alias: 02/06-01-31-18 W4M
Location Alias 2: 02/06-01-031-18 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 18
Section: 01
County/Municipality: Starland County
Well Name: POCO MICHICHI 6-1-31-18
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0125800
License Date: 1987-02-11
License Status: RecCertified
Spud Date: 1987-02-11
Final Drill Date: 1987-02-15
Well Total Depth: 1421.00 m
Surface Hole Latitude: 51.623841
Surface Hole Longitude: -112.426990

For data sources see[1][2]

Well History

Date Event
1987-02-11 Obtained License
1987-02-12 Surface Casing Operation Performed
1987-02-15 Finished Drilling
1987-02-15 Well Log Performed
1987-02-15 Well Mode changed to Drilled and Cased
1987-02-16 Drill Stem Test Performed
1987-02-17 Production Casing Operation Performed
1987-02-17 Rig Released
1987-02-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-02-21 Perforation Treatment Performed - Jet Perforation
1987-02-21 Well Log Performed
1987-02-22 Perforation Treatment Performed - Jet Perforation
1987-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-02-24 Perforation Treatment Performed - Jet Perforation
1987-02-26 Perforation Treatment Performed - Jet Perforation
1987-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-03-04 Perforation Treatment Performed - Fractured
1987-04-24 Well Began Production
1987-04-24 Well Fluid changed to Crude Oil
1987-04-24 Well Mode changed to Pumping
1989-04-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-04-27 Perforation Treatment Performed - Jet Perforation
1989-04-27 Plug Back Performed
1989-04-27 Well Fluid changed to Crude Oil
1989-04-27 Well Log Performed
1989-04-27 Well Mode changed to Abandoned Zone
1989-07-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-07-20 Plug Back Performed
1989-07-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-02-21 Perforation 1387.50 1388.50 13
1987-02-26 Perforation 1352.00 1353.00 7
1987-02-26 Perforation 1354.00 1355.00 7
1987-02-26 Perforation 1356.00 1357.00 7
1987-02-26 Perforation 1358.00 1359.00 7
1987-02-27 Acid Treatment 1349.50 1359.00 0
1987-03-04 Fracture 1349.50 1359.00 0
1989-04-27 Packing Device Capped w/Cement 1332.00 1340.00 0
1989-04-27 Perforation 1315.50 1317.00 13
1989-04-27 Perforation 1320.00 1324.00 13
1989-07-20 Packing Device Capped w/Cement 1298.00 1306.00 0
1987-02-21 Acid Treatment 1387.50 1388.50 0
1987-02-22 Perforation 1370.50 1373.00 7
1987-02-22 Perforation 1374.00 1375.50 7
1987-02-23 Acid Treatment 1370.50 1375.50 0
1987-02-24 Perforation 1363.00 1365.00 7
1987-02-24 Perforation 1366.50 1368.00 7
1987-02-24 Acid Treatment 1363.00 1368.00 0
1987-02-26 Perforation 1349.50 1350.50 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 2339 0.0 0.0 0.0
1988 870 0.0 0.0 0.0

For data sources see[5]

References