X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314161808000

Well Details

Well ID: 0314161808000
Loading map...
Location: 00/08-18-031-16W4/0
Location Alias: 00/08-18-31-16 W4M
Location Alias 2: 00/08-18-031-16 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 16
Section: 18
County/Municipality: Starland County
Well Name: MARQUEE MICHI 8-18-31-16
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0127904
License Date: 1987-08-13
License Status: Issued
Spud Date: 1987-08-20
Final Drill Date: 1987-08-25
Well Total Depth: 1349.00 m
Surface Hole Latitude: 51.655906
Surface Hole Longitude: -112.250226

For data sources see[1][2]

Well History

Date Event
1987-08-13 Obtained License
1987-08-21 Surface Casing Operation Performed
1987-08-25 Finished Drilling
1987-08-25 Well Log Performed
1987-08-25 Well Mode changed to Drilled and Cased
1987-08-26 Production Casing Operation Performed
1987-08-27 Rig Released
1987-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-08-31 Perforation Treatment Performed - Jet Perforation
1987-09-01 Perforation Treatment Performed - Jet Perforation
1987-09-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-09-08 Perforation Treatment Performed - Fractured
1987-11-03 Well Began Production
1987-11-03 Well Fluid changed to Gas
1987-11-03 Well Mode changed to Flowing
1998-03-10 Well Fluid changed to Gas
1998-03-10 Well Mode changed to Suspended
1998-04-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-04-22 Plug Back Performed
1998-04-22 Well Fluid changed to Gas
1998-04-22 Well Log Performed
1998-04-22 Well Mode changed to Abandoned Zone
1998-04-23 Perforation Treatment Performed - Jet Perforation
1998-04-24 Perforation Treatment Performed - Cement Squeeze
1998-04-25 Perforation Treatment Performed - Jet Perforation
1998-04-25 Perforation Treatment Performed - Remedial Casing
1998-04-27 Perforation Treatment Performed - Jet Perforation
1998-04-27 Perforation Treatment Performed - Remedial Casing
1998-04-29 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-08-31 Perforation 1289.00 1292.00 13
1998-04-25 Perforation 300.00 301.00 13
1998-04-25 Remedial Casing Cementing 300.00 301.00 0
1998-04-27 Perforation 225.00 226.00 13
1998-04-27 Remedial Casing Cementing 225.00 226.00 0
1998-04-29 Perforation 208.00 210.00 13
1987-08-31 Acid Treatment 1289.00 1292.00 0
1987-09-01 Perforation 1283.00 1284.50 13
1987-09-01 Perforation 1285.00 1286.00 13
1987-09-02 Acid Treatment 1283.00 1286.00 0
1987-09-08 Fracture 1283.00 1292.00 0
1998-04-22 Packing Device Capped w/Cement 1270.00 1278.00 0
1998-04-23 Perforation 603.50 605.00 13
1998-04-24 Cement Squeeze 603.50 605.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 1382 0.0 0.0 0.0
1988 7994 0.0 0.0 0.0
1989 8612 0.0 0.0 0.0
1990 8471 0.0 0.0 0.0
1991 7143 0.0 0.0 0.0
1992 8672 0.0 0.0 0.0
1993 8485 0.0 0.0 0.0
1994 8528 0.0 0.0 0.0
1995 8270 0.0 0.0 0.0
1996 5746 0.0 0.0 0.0

For data sources see[5]

References