If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0314140809000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.643439,"lon":-111.94509,"icon":""}]} |
Location: 00/09-08-031-14W4/0 | |
Location Alias: 00/09-08-31-14 W4M | |
Location Alias 2: 00/09-08-031-14 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 031 | |
Meridian: 4 | |
Range: 14 | |
Section: 08 | |
County/Municipality: Special Areas No. 2 | |
Well Name: HB HANNA 9-8-31-14 | |
Operator Name: ConocoPhillips Canada Resources Corp. | |
License Number: 0001311 | |
License Date: 1950-03-29 | |
License Status: RecCertified | |
Spud Date: 1950-04-15 | |
Final Drill Date: 1950-05-15 | |
Well Total Depth: 1168.00 m | |
Surface Hole Latitude: 51.643439 | |
Surface Hole Longitude: -111.945090 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1950-03-29 | Obtained License |
1950-04-29 | Drill Stem Test Performed |
1950-04-30 | Drill Stem Test Performed |
1950-05-04 | Drill Stem Test Performed |
1950-05-09 | Drill Stem Test Performed |
1950-05-10 | Drill Stem Test Performed |
1950-05-12 | Drill Stem Test Performed |
1950-05-15 | Finished Drilling |
1950-05-16 | Production Casing Operation Performed |
1950-05-20 | Perforation Treatment Performed - Open-Hole Completion |
1950-05-26 | Perforation Treatment Performed - Bullet Perforation |
1950-05-26 | Well Mode changed to Drilled and Cased |
1969-06-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1969-06-19 | Well Abandoned |
1969-06-19 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1950-05-20 | Open Hole/Barefoot Completion | 1129.00 | 1168.00 | 0 |
1950-05-26 | Bullet Perforation | 1129.60 | 1130.50 | 0 |
1969-06-19 | Packing Device Capped w/Cement | 1106.40 | 1106.40 | 0 |
For data sources see[4]