If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0314130608002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 00/08-06-031-13W4/2 | |
| Location Alias: 00/08-06-31-13 W4M | |
| Location Alias 2: 00/08-06-031-13 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 031 | |
| Meridian: 4 | |
| Range: 13 | |
| Section: 06 | |
| County/Municipality: Special Areas No. 2 | |
| Well Name: BAYTEX RICHDALE 8-6-31-13 | |
| Operator Name: Baytex Energy Ltd. | |
| License Number: 0393057 | |
| License Date: 2008-01-28 | |
| License Status: Issued | |
| Spud Date: 2008-02-08 | |
| Final Drill Date: 2008-02-11 | |
| Well Total Depth: 1172.00 m | |
| Surface Hole Latitude: 51.626916 | |
| Surface Hole Longitude: -111.828839 |
| Date | Event |
|---|---|
| 2008-01-28 | Obtained License |
| 2008-02-09 | Surface Casing Operation Performed |
| 2008-02-11 | Finished Drilling |
| 2008-02-11 | Well Mode changed to Drilled and Cased |
| 2008-02-12 | Production Casing Operation Performed |
| 2008-02-12 | Well Log Performed |
| 2008-02-13 | Rig Released |
| 2008-02-17 | Perforation Treatment Performed - Jet Perforation |
| 2008-02-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2008-02-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2008-02-22 | Plug Back Performed |
| 2008-02-23 | Perforation Treatment Performed - Jet Perforation |
| 2008-03-28 | Well Began Production |
| 2008-03-28 | Well Fluid changed to Gas |
| 2008-03-28 | Well Mode changed to Flowing |
| 2019-06-30 | Well Fluid changed to Gas |
| 2019-06-30 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2008-02-17 | Perforation | 1150.00 | 1155.00 | 17 |
| 2008-02-21 | Acid Treatment | 1150.00 | 1155.00 | 0 |
| 2008-02-22 | Packing Device Capped w/Cement | 1140.00 | 1148.00 | 0 |
| 2008-02-23 | Perforation | 1130.00 | 1132.00 | 17 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2008 | 6216 | 0.0 | 0.0 | 0.0 |
| 2009 | 8214 | 0.0 | 0.0 | 0.0 |
| 2010 | 8316 | 0.0 | 0.0 | 0.0 |
| 2011 | 7246 | 0.0 | 0.0 | 0.0 |
| 2012 | 8305 | 0.0 | 0.0 | 0.0 |
| 2013 | 7063 | 0.0 | 0.0 | 0.0 |
| 2014 | 5391 | 0.0 | 0.0 | 0.0 |
| 2015 | 8382 | 0.0 | 0.0 | 0.0 |
| 2016 | 8346 | 0.0 | 0.0 | 0.0 |
| 2017 | 8705 | 0.0 | 0.0 | 0.0 |
| 2018 | 3473 | 0.0 | 0.0 | 0.0 |
For data sources see[5]