X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314102402002

Well Details

Well ID: 0314102402002
Loading map...
Location: 00/02-24-031-10W4/2
Location Alias: 00/02-24-31-10 W4M
Location Alias 2: 00/02-24-031-10 W4/02
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 10
Section: 24
County/Municipality: Special Areas No. 2
Well Name: ARC 2-24-31-10
Operator Name: ARC Resources Ltd.
License Number: 0049581
License Date: 1974-04-05
License Status: RecCertified
Spud Date: 1974-04-05
Final Drill Date: 1974-05-26
Well Total Depth: 1158.20 m
Surface Hole Latitude: 51.665253
Surface Hole Longitude: -111.289503

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-04-05 Obtained License
1974-05-23 Drill Stem Test Performed
1974-05-26 Finished Drilling
1974-05-26 Well Mode changed to Drilled and Cased
1974-05-27 Drill Stem Test Performed
1974-05-28 Drill Stem Test Performed
1974-05-29 Production Casing Operation Performed
1974-09-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-09-07 Perforation Treatment Performed - Jet Perforation
1980-12-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-12-31 Perforation Treatment Performed - Jet Perforation
1981-01-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-03 Perforation Treatment Performed - Cement Squeeze
1981-01-06 Perforation Treatment Performed - Jet Perforation
1981-01-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-03-18 Well Began Production
1981-03-18 Well Fluid changed to Gas
1981-03-18 Well Mode changed to Flowing
1986-12-31 Well Fluid changed to Gas
1986-12-31 Well Mode changed to Suspended
1988-02-01 Well Fluid changed to Gas
1988-02-01 Well Mode changed to Flowing
1988-03-01 Well Fluid changed to Gas
1988-03-01 Well Mode changed to Suspended
1994-11-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-11-03 Plug Back Performed
1994-11-03 Well Fluid changed to Gas
1994-11-03 Well Mode changed to Abandoned
1994-11-11 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-09-07 Perforation 1128.40 1129.90 7
1981-01-06 Perforation 1031.70 1033.90 13
1981-01-08 Acid Treatment 1031.70 1033.90 0
1994-11-03 Packing Device Capped w/Cement 1012.00 1020.00 0
1974-09-07 Acid Treatment 1128.40 1129.90 0
1974-09-07 Perforation 1128.10 1129.00 7
1974-09-07 Acid Treatment 1128.10 1129.90 0
1980-12-30 Packing Device Capped w/Cement 1117.00 1125.00 0
1980-12-31 Perforation 1035.00 1036.00 6
1980-12-31 Perforation 1036.00 1039.00 6
1981-01-03 Acid Treatment 1035.00 1039.00 0
1981-01-03 Cement Squeeze 1035.00 1039.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 3428 0.0 0.0 0.0
1982 3782 0.0 0.0 0.0
1983 6633 0.0 0.0 0.0
1984 3275 0.0 0.0 0.0
1985 2831 0.0 0.0 0.0
1986 1534 0.0 0.0 0.0
1988 696 0.0 0.0 0.0

For data sources see[5]

References