X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0305033106020

Well Details

Well ID: 0305033106020
Loading map...
Location: 02/06-31-030-03W5/0
Location Alias: 02/06-31-30-03 W5M
Location Alias 2: 02/06-31-030-03 W5/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 5
Range: 03
Section: 31
County/Municipality: Mountain View County
Well Name: NCE (88-1) WESTCOTT 6-31-30-3
Operator Name: Allied Oil & Gas Corp.
License Number: 0018489
License Date: 1960-01-13
License Status: RecCertified
Spud Date: 1959-12-14
Final Drill Date: 1960-01-09
Well Total Depth: 2190.00 m
Surface Hole Latitude: 51.611182
Surface Hole Longitude: -114.414760

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-01-08 Drill Stem Test Performed
1960-01-09 Finished Drilling
1960-01-09 Well Mode changed to Drilled and Cased
1960-01-10 Production Casing Operation Performed
1960-01-13 Obtained License
1960-01-28 Perforation Treatment Performed - Selective Jet Perforations
1960-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-02-12 Perforation Treatment Performed - Fractured
1960-02-16 Perforation Treatment Performed - Fractured
1960-02-22 Well Began Production
1960-02-22 Well Fluid changed to Crude Oil
1960-02-22 Well Mode changed to Flowing
1972-12-01 Well Fluid changed to Crude Oil
1972-12-01 Well Mode changed to Suspended
1992-09-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-09-06 Perforation Treatment Performed - Jet Perforation
1992-09-06 Plug Back Performed
1992-09-06 Well Fluid changed to Crude Oil
1992-09-06 Well Mode changed to Abandoned
1992-09-11 Perforation Treatment Performed - Remedial Casing
1992-10-23 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-01-28 Selective Jet Perforations 2165.50 2167.30 0
1960-01-31 Acid Treatment 2165.50 2167.30 0
1960-02-08 Acid Treatment 2165.50 2167.30 0
1960-02-12 Fracture 2165.50 2167.30 0
1960-02-16 Fracture 2165.50 2167.30 0
1992-09-06 Packing Device Capped w/Cement 2140.00 2155.00 0
1992-09-06 Perforation 620.00 621.00 13
1992-09-11 Remedial Casing Cementing 620.00 621.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0

For data sources see[5]

References