X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0305032906000

Well Details

Well ID: 0305032906000
Loading map...
Location: 00/06-29-030-03W5/0
Location Alias: 00/06-29-30-03 W5M
Location Alias 2: 00/06-29-030-03 W5/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 5
Range: 03
Section: 29
County/Municipality: Mountain View County
Well Name: NCE (88-1) WESTCOTT 6-29-30-3
Operator Name: Allied Oil & Gas Corp.
License Number: 0018086
License Date: 1959-11-10
License Status: RecCertified
Spud Date: 1959-11-16
Final Drill Date: 1959-12-07
Well Total Depth: 2160.40 m
Surface Hole Latitude: 51.596724
Surface Hole Longitude: -114.391194

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-11-10 Obtained License
1959-12-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-12-01 Perforation Treatment Performed - Selective Jet Perforations
1959-12-07 Finished Drilling
1959-12-07 Well Mode changed to Drilled and Cased
1959-12-08 Drill Stem Test Performed
1959-12-09 Production Casing Operation Performed
1960-02-20 Perforation Treatment Performed - Selective Bullet Perforations
1960-02-24 Perforation Treatment Performed - Fractured
1960-03-03 Well Began Production
1960-03-03 Well Fluid changed to Crude Oil
1960-03-03 Well Mode changed to Flowing
1962-05-18 Well Fluid changed to Crude Oil
1962-05-18 Well Mode changed to Pumping
1965-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-08-15 Perforation Treatment Performed - Cement Plug
1972-08-15 Well Abandoned
1972-08-15 Well Fluid changed to Crude Oil
1972-08-15 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-12-01 Selective Jet Perforations 2129.90 2130.20 0
1972-08-15 Cement Plug 0.10 2160.40 0
1959-12-01 Selective Jet Perforations 2130.60 2130.90 0
1959-12-01 Selective Jet Perforations 2131.20 2132.10 0
1959-12-01 Acid Treatment 2129.90 2132.10 0
1960-02-20 Selective Bullet Perforations 2132.40 2132.70 0
1960-02-20 Selective Bullet Perforations 2133.00 2133.30 0
1960-02-20 Selective Bullet Perforations 2133.90 2133.90 0
1960-02-24 Fracture 2132.40 2133.90 0
1965-03-23 Acid Treatment 2129.90 2133.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 24 0.0 0.0 0.0

For data sources see[5]

References