X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0305031706000

Well Details

Well ID: 0305031706000
Loading map...
Location: 00/06-17-030-03W5/0
Location Alias: 00/06-17-30-03 W5M
Location Alias 2: 00/06-17-030-03 W5/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 5
Range: 03
Section: 17
County/Municipality: Mountain View County
Well Name: CDN-SUP CROSSFIELD 6-17-30-3
Operator Name: ExxonMobil Canada Resources Company
License Number: 0096289
License Date: 1982-06-14
License Status: RecCertified
Spud Date: 1982-06-15
Final Drill Date: 1982-07-02
Well Total Depth: 2395.00 m
Surface Hole Latitude: 51.568095
Surface Hole Longitude: -114.390441

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-06-14 Obtained License
1982-07-02 Finished Drilling
1982-07-03 Well Log Performed
1982-07-06 Production Casing Operation Performed
1982-11-06 Perforation Treatment Performed - Jet Perforation
1982-11-07 Perforation Treatment Performed - Fractured
1982-11-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-11-17 Perforation Treatment Performed - Jet Perforation
1982-11-18 Perforation Treatment Performed - Fractured
1982-11-24 Perforation Treatment Performed - Cement Squeeze
1982-11-26 Perforation Treatment Performed - Jet Perforation
1982-11-27 Perforation Treatment Performed - Fractured
1982-12-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-12-30 Well Mode changed to Drilled and Cased
1989-10-17 Perforation Treatment Performed - Cement Squeeze
1989-10-17 Plug Back Performed
1989-10-17 Well Mode changed to Abandoned
1989-10-18 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-11-06 Perforation 2338.00 2340.00 13
1982-11-27 Fracture 2099.50 2101.50 0
1982-12-03 Packing Device Capped w/Cement 2089.00 2097.00 0
1989-10-17 Cement Squeeze 2076.00 2077.50 0
1982-11-06 Perforation 2341.00 2343.00 13
1982-11-06 Perforation 2344.00 2346.00 13
1982-11-07 Fracture 2338.00 2346.00 0
1982-11-17 Packing Device Capped w/Cement 2320.00 2328.00 0
1982-11-17 Perforation 2076.00 2077.50 13
1982-11-18 Fracture 2076.00 2077.50 0
1982-11-24 Cement Squeeze 2076.00 2077.50 0
1982-11-26 Perforation 2099.50 2101.50 13

For data sources see[4]



References