X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0305031614020

Well Details

Well ID: 0305031614020
Loading map...
Location: 02/14-16-030-03W5/0
Location Alias: 02/14-16-30-03 W5M
Location Alias 2: 02/14-16-030-03 W5/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 5
Range: 03
Section: 16
County/Municipality: Mountain View County
Well Name: TRANSGLOBE CROSS 14-16-30-3
Operator Name: TransGlobe Energy Corporation
License Number: 0429614
License Date: 2011-01-07
License Status: RecCertified
Spud Date: 2011-01-17
Final Drill Date: 2011-02-06
Well Total Depth: 3667.00 m
Surface Hole Latitude: 51.563571
Surface Hole Longitude: -114.366422

For data sources see[1][2]

Well History

Date Event
2011-01-07 Obtained License
2011-01-19 Surface Casing Operation Performed
2011-01-24 Direction Drilling Operation Performed - Horizontal
2011-01-24 Well Log Performed
2011-01-31 Intermediate Casing Operation Performed
2011-02-01 Well Log Performed
2011-02-06 Finished Drilling
2011-02-06 Well Log Performed
2011-02-06 Well Mode changed to Drilled and Cased
2011-02-08 Well Log Performed
2011-02-09 Liner Casing Operation Performed
2011-02-09 Perforation Treatment Performed - Open-Hole Completion
2011-02-11 Rig Released
2011-02-21 Well Log Performed
2011-03-02 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-10-01 Plug Back Performed
2011-10-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-10-02 Plug Back Performed
2011-10-02 Well Log Performed
2011-10-02 Well Mode changed to Abandoned Zone
2011-10-11 Well Abandoned
2011-10-11 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-01-24 2018.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-02-09 Open Hole/Barefoot Completion 3625.00 3667.00 0
2011-03-02 Multi-Stage Fracture 2693.30 2693.40 0
2011-03-02 Multi-Stage Fracture 2561.00 2561.10 0
2011-10-01 Packing Device Capped w/Cement 2301.40 2430.00 0
2011-10-02 Packing Device Capped w/Cement 2252.00 2260.00 0
2011-03-02 Multi-Stage Fracture 3625.00 3625.10 0
2011-03-02 Multi-Stage Fracture 3531.70 3531.80 0
2011-03-02 Multi-Stage Fracture 3402.50 3402.60 0
2011-03-02 Multi-Stage Fracture 3282.00 3282.10 0
2011-03-02 Multi-Stage Fracture 3161.80 3161.90 0
2011-03-02 Multi-Stage Fracture 3040.40 3040.50 0
2011-03-02 Multi-Stage Fracture 2920.90 2921.00 0
2011-03-02 Multi-Stage Fracture 2800.10 2800.20 0

For data sources see[5]



References