X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0305031006022

Well Details

Well ID: 0305031006022
Loading map...
Location: 02/06-10-030-03W5/2
Location Alias: 02/06-10-30-03 W5M
Location Alias 2: 02/06-10-030-03 W5/02
Country: Canada
Province: Alberta
Township: 030
Meridian: 5
Range: 03
Section: 10
County/Municipality: Mountain View County
Well Name: TRANSGLOBE CROSS 11-10-30-3
Operator Name: TransGlobe Energy Corporation
License Number: 0431454
License Date: 2011-02-11
License Status: Amended
Spud Date: 2011-04-11
Final Drill Date: 2011-05-09
Well Total Depth: 3785.40 m
Surface Hole Latitude: 51.564095
Surface Hole Longitude: -114.352174

For data sources see[1][2]

Well History

Date Event
2011-02-11 Obtained License
2011-04-14 Surface Casing Operation Performed
2011-04-16 Direction Drilling Operation Performed - Horizontal
2011-04-23 Intermediate Casing Operation Performed
2011-04-29 Well Log Performed
2011-05-03 Direction Drilling Operation Performed - Horizontal
2011-05-09 Finished Drilling
2011-05-09 Well Log Performed
2011-05-09 Well Mode changed to Drilled and Cased
2011-05-10 Well Log Performed
2011-05-11 Well Log Performed
2011-05-12 Liner Casing Operation Performed
2011-05-12 Perforation Treatment Performed - Open-Hole Completion
2011-05-13 Rig Released
2011-06-13 Well Log Performed
2011-06-15 Perforation Treatment Performed - Multi-Stage Fracture
2011-06-16 Perforation Treatment Performed - Multi-Stage Fracture
2011-06-18 Perforation Treatment Performed - Multi-Stage Fracture
2011-06-20 Perforation Treatment Performed - Multi-Stage Fracture
2011-07-01 Well Began Production
2011-07-01 Well Fluid changed to Gas
2011-07-01 Well Mode changed to Flowing
2012-01-01 Well Fluid changed to Gas
2012-01-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-04-16 1784.60 Horizontal
2011-05-03 2531.80 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-05-12 Open Hole/Barefoot Completion 3746.40 3785.40 0
2011-06-20 Multi-Stage Fracture 2759.30 2759.40 0
2011-06-20 Multi-Stage Fracture 2655.60 2655.70 0
2011-06-15 Multi-Stage Fracture 3745.70 3745.80 0
2011-06-16 Multi-Stage Fracture 3603.10 3603.20 0
2011-06-16 Multi-Stage Fracture 3486.00 3486.10 0
2011-06-16 Multi-Stage Fracture 3369.00 3369.10 0
2011-06-18 Multi-Stage Fracture 3226.50 3226.60 0
2011-06-18 Multi-Stage Fracture 3109.80 3109.90 0
2011-06-18 Multi-Stage Fracture 3044.50 3044.60 0
2011-06-20 Multi-Stage Fracture 2888.90 2889.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 3470 0.0 0.0 0.0
2012 8740 0.0 0.0 0.0
2013 8687 0.0 0.0 0.0
2014 8579 0.0 0.0 0.0
2015 7428 0.0 0.0 0.0
2016 8759 0.0 0.0 0.0
2017 8687 0.0 0.0 0.0
2018 8063 0.0 0.0 0.0
2019 8616 0.0 0.0 0.0
2020 1920 0.0 0.0 0.0

For data sources see[6]

References