X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0305023310000

Well Details

Well ID: 0305023310000
Loading map...
Location: 00/10-33-030-02W5/0
Location Alias: 00/10-33-30-02 W5M
Location Alias 2: 00/10-33-030-02 W5/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 5
Range: 02
Section: 33
County/Municipality: Mountain View County
Well Name: TRANSGLOBE CROSS 10-33-30-2
Operator Name: TransGlobe Energy Corporation
License Number: 0409441
License Date: 2009-02-25
License Status: Abandoned
Spud Date: 2009-06-04
Final Drill Date: 2009-06-15
Well Total Depth: 2570.00 m
Surface Hole Latitude: 51.612047
Surface Hole Longitude: -114.223268

For data sources see[1][2]

Well History

Date Event
2009-02-25 Obtained License
2009-06-05 Surface Casing Operation Performed
2009-06-07 Direction Drilling Operation Performed - Deviate
2009-06-14 Well Log Performed
2009-06-15 Finished Drilling
2009-06-15 Well Mode changed to Drilled and Cased
2009-06-16 Production Casing Operation Performed
2009-06-16 Rig Released
2009-07-18 Well Log Performed
2009-07-19 Perforation Treatment Performed - Jet Perforation
2009-08-06 Well Log Performed
2009-08-07 Perforation Treatment Performed - Jet Perforation
2009-08-09 Perforation Treatment Performed - Fractured
2010-07-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-07-22 Plug Back Performed
2010-07-22 Well Log Performed
2010-07-22 Well Mode changed to Abandoned Zone
2010-08-25 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-06-07 749.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-07-19 Perforation 2507.00 2508.00 17
2009-08-07 Perforation 2240.00 2241.00 17
2009-08-09 Fracture 2240.00 2241.00 0
2010-07-22 Packing Device Capped w/Cement 2227.00 2235.00 0

For data sources see[5]



References