X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0305012706000

Well Details

Well ID: 0305012706000
Loading map...
Location: 00/06-27-030-01W5/0
Location Alias: 00/06-27-30-01 W5M
Location Alias 2: 00/06-27-030-01 W5/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 5
Range: 01
Section: 27
County/Municipality: Mountain View County
Well Name: TYRRAL CROSSE 6-27-30-1
Operator Name: Sogar Resources Ltd.
License Number: 0101450
License Date: 1983-05-27
License Status: RecExempt
Spud Date: 1983-06-02
Final Drill Date: 1983-06-21
Well Total Depth: 1796.00 m
Surface Hole Latitude: 51.597895
Surface Hole Longitude: -114.061153

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-05-27 Obtained License
1983-06-21 Finished Drilling
1983-06-21 Well Mode changed to Drilled and Cased
1983-06-22 Well Log Performed
1983-06-25 Production Casing Operation Performed
1983-06-25 Well Log Performed
1983-08-02 Perforation Treatment Performed - Jet Perforation
1983-08-03 Perforation Treatment Performed - Fractured
1983-09-06 Well Began Production
1983-09-06 Well Fluid changed to Crude Oil
1983-09-06 Well Mode changed to Pumping
1992-11-12 Well Fluid changed to Crude Oil
1992-11-12 Well Mode changed to Suspended
1993-10-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-10-22 Perforation Treatment Performed - Jet Perforation
1993-10-22 Perforation Treatment Performed - Remedial Casing
1993-10-22 Plug Back Performed
1993-10-22 Well Fluid changed to Crude Oil
1993-10-22 Well Log Performed
1993-10-22 Well Mode changed to Abandoned
1993-11-09 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-08-02 Perforation 1766.00 1769.00 13
1983-08-03 Fracture 1766.00 1769.00 0
1993-10-22 Packing Device Capped w/Cement 1741.50 1750.00 0
1993-10-22 Perforation 570.00 571.00 13
1993-10-22 Remedial Casing Cementing 570.00 571.00 0
1993-10-22 Packing Device Capped w/Cement 538.00 565.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 2235 0.0 0.0 0.0
1984 5607 0.0 0.0 0.0
1985 2816 0.0 0.0 0.0
1986 2253 0.0 0.0 0.0
1987 1933 0.0 0.0 0.0
1988 5766 0.0 0.0 0.0
1989 8515 0.0 0.0 0.0
1990 8445 0.0 0.0 0.0
1991 8735 0.0 0.0 0.0
1992 4957 0.0 0.0 0.0

For data sources see[5]

References