If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304291311000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.572057,"lon":-113.957395,"icon":""}]} |
Location: 00/11-13-030-29W4/0 | |
Location Alias: 00/11-13-30-29 W4M | |
Location Alias 2: 00/11-13-030-29 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 29 | |
Section: 13 | |
County/Municipality: Mountain View County | |
Well Name: CDN-SUP CROSSE 11-13-30-29 | |
Operator Name: ExxonMobil Canada Resources Company | |
License Number: 0071289 | |
License Date: 1978-08-11 | |
License Status: Abandoned | |
Spud Date: 1978-09-01 | |
Final Drill Date: 1978-09-26 | |
Well Total Depth: 2547.00 m | |
Surface Hole Latitude: 51.572057 | |
Surface Hole Longitude: -113.957395 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1978-08-11 | Obtained License |
1978-09-26 | Finished Drilling |
1978-09-26 | Well Log Performed |
1978-09-27 | Drill Stem Test Performed |
1978-09-28 | Drill Stem Test Performed |
1978-09-29 | Drill Stem Test Performed |
1978-09-30 | Production Casing Operation Performed |
1979-04-03 | Well Mode changed to Drilled and Cased |
1980-09-30 | Perforation Treatment Performed - Jet Perforation |
1980-10-03 | Perforation Treatment Performed - Fractured |
1980-10-11 | Well Mode changed to Drilled and Cased |
1990-08-29 | Well Began Production |
1990-08-29 | Well Fluid changed to Gas |
1990-08-29 | Well Mode changed to Flowing |
1991-06-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-06-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-12-01 | Well Fluid changed to Gas |
1995-12-01 | Well Mode changed to Suspended |
1997-06-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-06-11 | Plug Back Performed |
1997-06-27 | Well Abandoned |
1997-06-27 | Well Fluid changed to Gas |
1997-06-27 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-09-30 | Perforation | 2516.50 | 2522.50 | 13 |
1980-10-03 | Fracture | 2516.50 | 2522.50 | 0 |
1991-06-26 | Acid Treatment | 2516.50 | 2522.50 | 0 |
1991-06-27 | Acid Treatment | 2516.50 | 2522.50 | 0 |
1997-06-11 | Packing Device Capped w/Cement | 2498.00 | 2506.00 | 0 |
1997-06-11 | Packing Device Capped w/Cement | 362.00 | 370.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 1762 | 0.0 | 0.0 | 0.0 |
1991 | 6926 | 0.0 | 0.0 | 0.0 |
1992 | 7813 | 0.0 | 0.0 | 0.0 |
1993 | 7954 | 0.0 | 0.0 | 0.0 |
1994 | 7271 | 0.0 | 0.0 | 0.0 |
1995 | 8015 | 0.0 | 0.0 | 0.0 |
For data sources see[5]