X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304291311000

Well Details

Well ID: 0304291311000
Loading map...
Location: 00/11-13-030-29W4/0
Location Alias: 00/11-13-30-29 W4M
Location Alias 2: 00/11-13-030-29 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 29
Section: 13
County/Municipality: Mountain View County
Well Name: CDN-SUP CROSSE 11-13-30-29
Operator Name: ExxonMobil Canada Resources Company
License Number: 0071289
License Date: 1978-08-11
License Status: Abandoned
Spud Date: 1978-09-01
Final Drill Date: 1978-09-26
Well Total Depth: 2547.00 m
Surface Hole Latitude: 51.572057
Surface Hole Longitude: -113.957395

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-08-11 Obtained License
1978-09-26 Finished Drilling
1978-09-26 Well Log Performed
1978-09-27 Drill Stem Test Performed
1978-09-28 Drill Stem Test Performed
1978-09-29 Drill Stem Test Performed
1978-09-30 Production Casing Operation Performed
1979-04-03 Well Mode changed to Drilled and Cased
1980-09-30 Perforation Treatment Performed - Jet Perforation
1980-10-03 Perforation Treatment Performed - Fractured
1980-10-11 Well Mode changed to Drilled and Cased
1990-08-29 Well Began Production
1990-08-29 Well Fluid changed to Gas
1990-08-29 Well Mode changed to Flowing
1991-06-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-12-01 Well Fluid changed to Gas
1995-12-01 Well Mode changed to Suspended
1997-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-06-11 Plug Back Performed
1997-06-27 Well Abandoned
1997-06-27 Well Fluid changed to Gas
1997-06-27 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-09-30 Perforation 2516.50 2522.50 13
1980-10-03 Fracture 2516.50 2522.50 0
1991-06-26 Acid Treatment 2516.50 2522.50 0
1991-06-27 Acid Treatment 2516.50 2522.50 0
1997-06-11 Packing Device Capped w/Cement 2498.00 2506.00 0
1997-06-11 Packing Device Capped w/Cement 362.00 370.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 1762 0.0 0.0 0.0
1991 6926 0.0 0.0 0.0
1992 7813 0.0 0.0 0.0
1993 7954 0.0 0.0 0.0
1994 7271 0.0 0.0 0.0
1995 8015 0.0 0.0 0.0

For data sources see[5]

References