X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304281610000

Well Details

Well ID: 0304281610000
Loading map...
Location: 00/10-16-030-28W4/0
Location Alias: 00/10-16-30-28 W4M
Location Alias 2: 00/10-16-030-28 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 28
Section: 16
County/Municipality: Mountain View County
Well Name: PWEI UNIT #1 LPINECK 10-16-30-28
Operator Name: TAQA North Ltd.
License Number: 0015209
License Date: 1958-05-15
License Status: Abandoned
Spud Date: 1958-05-18
Final Drill Date: 1958-06-29
Well Total Depth: 2480.80 m
Surface Hole Latitude: 51.571008
Surface Hole Longitude: -113.882237

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-05-15 Obtained License
1958-06-07 Drill Stem Test Performed
1958-06-21 Drill Stem Test Performed
1958-06-29 Finished Drilling
1958-06-29 Perforation Treatment Performed - Jet Perforation
1958-06-29 Production Casing Operation Performed
1958-07-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-07-02 Perforation Treatment Performed - Fractured
1958-07-08 Perforation Treatment Performed - Fractured
1958-07-23 Perforation Treatment Performed - Jet Perforation
1958-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-01-12 Well Mode changed to Drilled and Cased
1986-02-11 Well Fluid changed to Gas
1986-02-11 Well Mode changed to Testing
1986-02-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-02-12 Plug Back Performed
1986-02-12 Well Fluid changed to Gas
1986-02-12 Well Log Performed
1986-02-12 Well Mode changed to Abandoned Zone
1986-02-13 Well Log Performed
1986-02-19 Perforation Treatment Performed - Jet Perforation
1986-02-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-01-19 Well Log Performed
1993-01-20 Perforation Treatment Performed - Jet Perforation
1993-01-24 Perforation Treatment Performed - Fractured
2008-12-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-12-17 Plug Back Performed
2008-12-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-12-18 Plug Back Performed
2019-11-21 Perforation Treatment Performed - Bridge Plug No Cement Required
2019-11-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-11-22 Perforation Treatment Performed - Jet Perforation
2019-11-22 Plug Back Performed
2019-11-23 Perforation Treatment Performed - Bridge Plug No Cement Required
2019-11-23 Perforation Treatment Performed - Jet Perforation
2019-11-24 Perforation Treatment Performed - Cement Plug
2019-11-24 Plug Back Performed
2019-12-05 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-06-29 Perforation 2453.60 2463.10 26
1986-02-19 Perforation 2127.50 2130.60 13
1986-02-21 Acid Treatment 2122.00 2130.60 0
1993-01-20 Perforation 2124.50 2130.60 13
1993-01-24 Fracture 2122.00 2130.60 0
2008-12-17 Packing Device Capped w/Cement 2109.00 2117.00 0
2008-12-18 Packing Device Capped w/Cement 1490.00 1498.00 0
2019-11-21 Bridge Plug, No Cement 978.00 978.30 0
2019-11-22 Perforation 969.00 971.00 17
2019-11-22 Packing Device Capped w/Cement 957.00 965.00 0
2019-11-23 Perforation 454.00 456.00 17
1958-07-02 Acid Treatment 2453.60 2463.10 0
2019-11-23 Perforation 424.00 426.00 17
2019-11-23 Perforation 340.00 342.00 17
2019-11-23 Perforation 295.00 297.00 17
2019-11-23 Perforation 257.00 259.00 17
2019-11-23 Bridge Plug, No Cement 464.00 464.50 0
2019-11-24 Cement Plug 223.00 465.00 0
1958-07-02 Fracture 2453.60 2463.10 0
1958-07-08 Fracture 2453.60 2463.10 0
1958-07-23 Perforation 2453.30 2461.00 13
1958-07-23 Perforation 2450.00 2453.30 13
1958-07-28 Acid Treatment 2450.00 2461.00 0
1986-02-12 Packing Device Capped w/Cement 2390.00 2398.00 0
1986-02-19 Perforation 2122.00 2126.60 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-11-21 No Incident Encountered 0.00 0.00

For data sources see[6]

References