X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304273210000

Well Details

Well ID: 0304273210000
Loading map...
Location: 00/10-32-030-27W4/0
Location Alias: 00/10-32-30-27 W4M
Location Alias 2: 00/10-32-030-27 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 27
Section: 32
County/Municipality: Mountain View County
Well Name: PWEI LPINECK 10-32-30-27
Operator Name: TAQA North Ltd.
License Number: 0027574
License Date: 1965-01-19
License Status: Suspension
Spud Date: 1965-01-26
Final Drill Date: 1965-02-25
Well Total Depth: 2432.60 m
Surface Hole Latitude: 51.614180
Surface Hole Longitude: -113.764277

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-01-19 Obtained License
1965-02-25 Finished Drilling
1965-02-27 Drill Stem Test Performed
1965-02-28 Drill Stem Test Performed
1965-03-01 Production Casing Operation Performed
1965-03-02 Perforation Treatment Performed - Permeator Perforation
1965-03-08 Perforation Treatment Performed - Cement Squeeze
1965-03-11 Perforation Treatment Performed - Abrasa-Jet Perforation
1965-03-11 Perforation Treatment Performed - Jet Perforation
1965-03-11 Perforation Treatment Performed - Open-Hole Completion
1965-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-03-13 Perforation Treatment Performed - Acid Wash - No Pressure
1965-03-18 Well Mode changed to Drilled and Cased
1965-05-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-07-21 Perforation Treatment Performed - Abrasa-Jet Perforation
1965-08-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-08-30 Perforation Treatment Performed - Jet Perforation
1965-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-12-05 Perforation Treatment Performed - Bullet Perforation
1965-12-07 Perforation Treatment Performed - Bullet Perforation
1965-12-08 Perforation Treatment Performed - Cement Squeeze
1965-12-11 Perforation Treatment Performed - Jet Perforation
1966-02-21 Perforation Treatment Performed - Cement Squeeze
1966-02-25 Perforation Treatment Performed - Jet Perforation
1966-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-12-21 Well Began Production
1967-12-21 Well Fluid changed to Gas
1967-12-21 Well Mode changed to Flowing
1968-05-06 Perforation Treatment Performed - Chemical Squeeze
1973-07-12 Perforation Treatment Performed - Cement Squeeze
1973-07-12 Well Fluid changed to Gas
1973-07-12 Well Mode changed to Flowing
1986-03-07 Perforation Treatment Performed - Jet Perforation
1986-04-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-09-02 Well Log Performed
1987-09-24 Well Log Performed
1990-08-30 Perforation Treatment Performed - Chemical Squeeze
1990-08-30 Well Log Performed
1992-02-23 Perforation Treatment Performed - Jet Perforation
1992-02-23 Well Log Performed
1992-02-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-02-26 Well Log Performed
1992-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-27 Perforation Treatment Performed - Jet Perforation
1992-07-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-09-01 Well Fluid changed to Gas
1992-09-01 Well Mode changed to Suspended
2000-01-28 Well Log Performed
2000-06-27 Well Log Performed
2000-06-29 Well Fluid changed to Gas
2000-06-29 Well Mode changed to Abandoned Zone
2005-02-03 Well Log Performed
2005-02-04 Well Log Performed
2005-03-31 Perforation Treatment Performed - Jet Perforation
2005-03-31 Well Log Performed
2005-04-03 Perforation Treatment Performed - Chemical Squeeze
2005-04-03 Well Log Performed
2006-04-03 Well Log Performed
2012-08-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-08-28 Perforation Treatment Performed - Cement Plug
2012-08-28 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-03-02 Permeator Perforation 2426.50 2431.70 0
1965-08-11 Acid Treatment 2428.60 2432.60 0
1965-08-30 Perforation 2431.40 2431.70 13
1965-09-01 Acid Treatment 2428.60 2432.60 0
1965-12-05 Bullet Perforation 2420.10 2420.40 20
1965-12-07 Bullet Perforation 2417.70 2418.00 10
1965-12-08 Cement Squeeze 2417.70 2432.60 0
1965-12-11 Perforation 2402.40 2406.70 7
1966-02-21 Cement Squeeze 2370.10 2370.70 0
1966-02-25 Perforation 2371.30 2373.20 7
1966-02-28 Acid Treatment 2371.30 2373.20 0
1965-03-08 Cement Squeeze 2426.50 2431.70 0
1968-05-06 Chemical Squeeze 2371.30 2373.20 0
1973-07-12 Cement Squeeze 2371.30 2373.20 0
1986-03-07 Perforation 2390.30 2393.80 13
1986-03-07 Perforation 2393.80 2399.30 13
1986-04-05 Acid Treatment 2390.30 2399.30 0
1990-08-30 Chemical Squeeze 2402.40 2406.70 0
1992-02-23 Perforation 2389.30 2389.60 80
1992-02-23 Perforation 2379.30 2379.60 80
1992-02-25 Packing Device Capped w/Cement 2385.40 2387.40 0
1992-02-27 Perforation 2362.80 2364.00 20
1965-03-11 Open Hole/Barefoot Completion 2431.70 2432.60 0
1992-02-27 Perforation 2364.30 2365.10 20
1992-02-27 Perforation 2366.80 2367.40 20
1992-02-27 Perforation 2367.70 2368.70 20
1992-02-27 Perforation 2370.10 2373.80 20
1992-02-27 Acid Treatment 2362.80 2379.60 0
1992-07-18 Acid Treatment 2362.80 2379.60 0
2005-03-31 Perforation 2356.00 2378.00 17
2005-04-03 Chemical Squeeze 2356.00 2378.00 0
2012-08-28 Packing Device Capped w/Cement 919.00 930.00 0
2012-08-28 Perforation 918.00 919.00 17
1965-03-11 Perforation 2370.10 2370.70 7
2012-08-28 Perforation 855.50 857.50 17
2012-08-28 Perforation 783.00 784.00 17
2012-08-28 Cement Plug 743.00 930.00 0
1965-03-11 Hydra Jet Perforation 2428.60 2428.60 0
1965-03-13 Acid Wash 2370.10 2370.70 0
1965-03-13 Acid Treatment 2370.10 2370.70 0
1965-05-27 Acid Treatment 2370.10 2370.70 0
1965-07-21 Hydra Jet Perforation 2432.30 2432.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 0 0.0 0.0 0.0
1968 841 0.0 0.0 0.0
1969 7355 0.0 0.0 0.0
1970 7629 0.0 0.0 0.0
1971 7428 0.0 0.0 0.0
1972 7603 0.0 0.0 0.0
1973 8075 0.0 0.0 0.0
1974 8185 0.0 0.0 0.0
1975 8042 0.0 0.0 0.0
1976 8251 0.0 0.0 0.0
1977 8528 0.0 0.0 0.0
1978 8234 0.0 0.0 0.0
1979 8352 0.0 0.0 0.0
1980 8169 0.0 0.0 0.0
1981 8479 0.0 0.0 0.0
1982 8643 0.0 0.0 0.0
1983 6009 0.0 0.0 0.0
1984 7461 0.0 0.0 0.0
1985 7510 0.0 0.0 0.0
1986 8383 0.0 0.0 0.0
1987 6896 0.0 0.0 0.0
1988 8167 0.0 0.0 0.0
1989 8480 0.0 0.0 0.0
1990 4082 0.0 0.0 0.0
1991 4268 0.0 0.0 0.0
1992 1928 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-21 No Incident Encountered 0.00 0.00

For data sources see[6]

References