X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304272010000

Well Details

Well ID: 0304272010000
Loading map...
Location: 00/10-20-030-27W4/0
Location Alias: 00/10-20-30-27 W4M
Location Alias 2: 00/10-20-030-27 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 27
Section: 20
County/Municipality: Mountain View County
Well Name: PWEI D-3 UNIT #1 LPINECK 10-20-30-27
Operator Name: TAQA North Ltd.
License Number: 0023296
License Date: 1962-11-06
License Status: Abandoned
Spud Date: 1962-12-08
Final Drill Date: 1963-01-13
Well Total Depth: 2507.00 m
Surface Hole Latitude: 51.584972
Surface Hole Longitude: -113.764309

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-11-06 Obtained License
1963-01-06 Drill Stem Test Performed
1963-01-12 Drill Stem Test Performed
1963-01-13 Drill Stem Test Performed
1963-01-13 Finished Drilling
1963-01-13 Well Mode changed to Drilled and Cased
1963-01-16 Production Casing Operation Performed
1963-01-19 Perforation Treatment Performed - Jet Perforation
1963-02-06 Well Began Production
1963-02-06 Well Fluid changed to Crude Oil
1963-02-06 Well Mode changed to Flowing
1972-02-17 Well Fluid changed to Crude Oil
1972-02-17 Well Mode changed to Suspended
1992-07-12 Perforation Treatment Performed - Open-Hole Completion
1992-11-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-11-14 Plug Back Performed
1992-11-14 Well Fluid changed to Crude Oil
1992-11-14 Well Log Performed
1992-11-14 Well Mode changed to Abandoned Zone
1992-11-16 Perforation Treatment Performed - Jet Perforation
1992-11-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-06-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-06-16 Plug Back Performed
1993-07-07 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-01-19 Perforation 2443.30 2444.80 13
1992-07-12 Open Hole/Barefoot Completion 2467.10 2507.00 0
1992-11-14 Packing Device Capped w/Cement 2420.00 2428.00 0
1992-11-16 Perforation 2033.60 2036.10 13
1992-11-16 Perforation 2042.10 2043.40 13
1992-11-16 Perforation 2006.20 2011.10 13
1992-11-21 Acid Treatment 2006.20 2043.40 0
1993-06-16 Packing Device Capped w/Cement 1979.80 1987.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 2324 0.0 0.0 0.0
1968 2591 0.0 0.0 0.0
1969 6185 0.0 0.0 0.0
1970 2033 0.0 0.0 0.0

For data sources see[5]

References