If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304270304020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.535314,"lon":-113.726253,"icon":""}]} |
Location: 02/04-03-030-27W4/0 | |
Location Alias: 02/04-03-30-27 W4M | |
Location Alias 2: 02/04-03-030-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 27 | |
Section: 03 | |
County/Municipality: Mountain View County | |
Well Name: EMBER ET AL 102 LPINECK 4-3-30-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0437238 | |
License Date: 2011-09-28 | |
License Status: Issued | |
Spud Date: 2011-12-15 | |
Final Drill Date: 2011-12-16 | |
Well Total Depth: 1132.00 m | |
Surface Hole Latitude: 51.535314 | |
Surface Hole Longitude: -113.726253 |
Date | Event |
---|---|
2011-09-28 | Obtained License |
2011-10-14 | Surface Casing Operation Performed |
2011-10-25 | Well Log Performed |
2011-10-26 | Well Log Performed |
2011-12-16 | Finished Drilling |
2011-12-16 | Well Mode changed to Drilled and Cased |
2011-12-17 | Production Casing Operation Performed |
2011-12-17 | Rig Released |
2011-12-27 | Well Log Performed |
2012-01-08 | Perforation Treatment Performed - Jet Perforation |
2012-01-08 | Well Log Performed |
2012-02-03 | Perforation Treatment Performed - Fractured |
2012-02-10 | Well Began Production |
2012-02-10 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-02-10 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-01-08 | Perforation | 990.00 | 992.00 | 13 |
2012-01-08 | Perforation | 733.00 | 733.50 | 13 |
2012-01-08 | Perforation | 720.50 | 721.00 | 13 |
2012-01-08 | Perforation | 717.00 | 718.00 | 13 |
2012-01-08 | Perforation | 703.50 | 704.00 | 13 |
2012-01-08 | Perforation | 702.00 | 702.50 | 13 |
2012-01-08 | Perforation | 697.00 | 698.00 | 13 |
2012-01-08 | Perforation | 684.00 | 686.00 | 13 |
2012-01-08 | Perforation | 681.50 | 684.00 | 13 |
2012-01-08 | Perforation | 610.50 | 612.00 | 13 |
2012-01-08 | Perforation | 607.50 | 609.00 | 13 |
2012-01-08 | Perforation | 769.00 | 769.50 | 13 |
2012-01-08 | Perforation | 586.00 | 587.00 | 13 |
2012-01-08 | Perforation | 544.00 | 544.50 | 13 |
2012-01-08 | Perforation | 541.00 | 544.00 | 13 |
2012-01-08 | Perforation | 476.00 | 477.00 | 13 |
2012-01-08 | Perforation | 434.50 | 435.00 | 13 |
2012-01-08 | Perforation | 408.50 | 409.00 | 13 |
2012-01-08 | Perforation | 361.00 | 362.00 | 13 |
2012-01-08 | Perforation | 358.00 | 359.00 | 13 |
2012-01-08 | Perforation | 351.00 | 351.50 | 13 |
2012-01-08 | Perforation | 348.00 | 348.50 | 13 |
2012-01-08 | Perforation | 765.50 | 766.50 | 13 |
2012-02-03 | Fracture | 769.00 | 769.50 | 0 |
2012-02-03 | Fracture | 765.50 | 766.50 | 0 |
2012-02-03 | Fracture | 760.00 | 761.00 | 0 |
2012-02-03 | Fracture | 754.50 | 755.50 | 0 |
2012-02-03 | Fracture | 752.50 | 753.50 | 0 |
2012-02-03 | Fracture | 745.00 | 747.00 | 0 |
2012-02-03 | Fracture | 741.00 | 742.00 | 0 |
2012-02-03 | Fracture | 738.00 | 738.50 | 0 |
2012-02-03 | Fracture | 733.00 | 733.50 | 0 |
2012-02-03 | Fracture | 720.50 | 721.00 | 0 |
2012-01-08 | Perforation | 760.00 | 761.00 | 13 |
2012-02-03 | Fracture | 717.00 | 718.00 | 0 |
2012-02-03 | Fracture | 703.50 | 704.00 | 0 |
2012-02-03 | Fracture | 702.00 | 702.50 | 0 |
2012-02-03 | Fracture | 697.00 | 698.00 | 0 |
2012-02-03 | Fracture | 684.00 | 686.00 | 0 |
2012-02-03 | Fracture | 681.50 | 684.00 | 0 |
2012-02-03 | Fracture | 610.50 | 612.00 | 0 |
2012-02-03 | Fracture | 607.50 | 609.00 | 0 |
2012-02-03 | Fracture | 586.00 | 587.00 | 0 |
2012-02-03 | Fracture | 544.00 | 544.50 | 0 |
2012-01-08 | Perforation | 754.50 | 755.50 | 13 |
2012-02-03 | Fracture | 541.00 | 544.00 | 0 |
2012-02-03 | Fracture | 476.00 | 477.00 | 0 |
2012-02-03 | Fracture | 434.50 | 435.00 | 0 |
2012-02-03 | Fracture | 408.50 | 409.00 | 0 |
2012-02-03 | Fracture | 361.00 | 362.00 | 0 |
2012-02-03 | Fracture | 358.00 | 359.00 | 0 |
2012-02-03 | Fracture | 351.00 | 351.50 | 0 |
2012-02-03 | Fracture | 348.00 | 348.50 | 0 |
2012-01-08 | Perforation | 752.50 | 753.50 | 13 |
2012-01-08 | Perforation | 745.00 | 747.00 | 13 |
2012-01-08 | Perforation | 741.00 | 742.00 | 13 |
2012-01-08 | Perforation | 738.00 | 738.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1802 | 0.0 | 0.0 | 0.0 |
2013 | 8719 | 0.0 | 0.0 | 0.0 |
2014 | 7631 | 0.0 | 0.0 | 0.0 |
2015 | 8706 | 0.0 | 0.0 | 0.0 |
2016 | 8780 | 0.0 | 0.0 | 0.0 |
2017 | 8676 | 0.0 | 0.0 | 0.0 |
2018 | 8757 | 0.0 | 0.0 | 0.0 |
2019 | 8654 | 0.0 | 0.0 | 0.0 |
2020 | 2176 | 0.0 | 0.0 | 0.0 |
For data sources see[5]