X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304262816000

Well Details

Well ID: 0304262816000
Loading map...
Location: 00/16-28-030-26W4/0
Location Alias: 00/16-28-30-26 W4M
Location Alias 2: 00/16-28-030-26 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 26
Section: 28
County/Municipality: Kneehill County
Well Name: HURON RES TWINING 16-28-30-26
Operator Name: Huron Resources Corp.
License Number: 0483005
License Date: 2017-02-27
License Status: Amended
Spud Date: 2017-03-23
Final Drill Date: 2017-04-17
Well Total Depth: 4820.00 m
Surface Hole Latitude: 51.582196
Surface Hole Longitude: -113.578904

For data sources see[1][2]

Well History

Date Event
2017-02-27 Obtained License
2017-03-25 Surface Casing Operation Performed
2017-03-28 Direction Drilling Operation Performed - Deviate
2017-03-30 Direction Drilling Operation Performed - Horizontal
2017-03-31 Well Log Performed
2017-04-17 Finished Drilling
2017-04-17 Well Log Performed
2017-04-17 Well Mode changed to Drilled and Cased
2017-04-21 Production Casing Operation Performed
2017-04-21 Rig Released
2017-08-11 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-12 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-13 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-02 Perforation Treatment Performed - Jet Perforation
2017-09-02 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-03 Perforation Treatment Performed - Jet Perforation
2017-09-03 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-04 Well Began Production
2017-10-04 Well Fluid changed to Crude Oil
2017-10-04 Well Mode changed to Pumping
2019-01-26 Perforation Treatment Performed - Jet Perforation
2019-01-26 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-27 Perforation Treatment Performed - Jet Perforation
2019-01-27 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-28 Perforation Treatment Performed - Jet Perforation
2019-01-28 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2017-03-28 1789.20 Deviate (5 - 79 degrees)
2017-03-30 2250.40 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-08-11 Multi-Stage Fracture 4690.00 4690.10 0
2017-08-12 Multi-Stage Fracture 4155.70 4155.80 0
2017-08-12 Multi-Stage Fracture 4096.00 4096.10 0
2017-08-12 Multi-Stage Fracture 4037.10 4037.20 0
2017-08-13 Multi-Stage Fracture 3977.50 3977.60 0
2017-09-02 Perforation 3845.00 3845.50 12
2017-09-02 Perforation 3792.00 3792.50 12
2017-09-02 Perforation 3732.00 3732.50 12
2017-09-02 Multi-Stage Fracture 3732.00 3845.50 0
2017-09-03 Perforation 3665.00 3665.50 12
2017-09-03 Perforation 3613.00 3613.50 12
2017-08-11 Multi-Stage Fracture 4632.20 4632.30 0
2017-09-03 Perforation 3554.00 3554.50 12
2017-09-03 Multi-Stage Fracture 3554.00 3665.50 0
2017-09-03 Perforation 3485.00 3485.50 12
2017-09-03 Perforation 3441.00 3441.50 12
2017-09-03 Perforation 3381.00 3381.50 12
2017-09-03 Multi-Stage Fracture 3381.00 3485.50 0
2017-09-03 Perforation 3305.00 3305.50 12
2017-09-03 Perforation 3360.00 3360.50 12
2017-09-03 Perforation 3198.00 3198.50 12
2017-09-03 Multi-Stage Fracture 3198.00 3305.50 0
2017-08-11 Multi-Stage Fracture 4572.50 4572.60 0
2019-01-26 Perforation 3069.90 3070.90 12
2019-01-26 Perforation 3035.00 3036.00 20
2019-01-26 Multi-Stage Fracture 3035.00 3036.00 0
2019-01-27 Perforation 2945.60 2946.60 20
2019-01-27 Multi-Stage Fracture 2945.60 2946.60 0
2019-01-27 Perforation 2822.60 2823.60 18
2019-01-27 Multi-Stage Fracture 2822.60 2823.60 0
2019-01-27 Perforation 2703.50 2704.50 18
2019-01-27 Multi-Stage Fracture 2703.50 2704.50 0
2019-01-27 Perforation 2585.40 2586.40 18
2017-08-11 Multi-Stage Fracture 4512.80 4512.90 0
2019-01-27 Multi-Stage Fracture 2585.40 2586.40 0
2019-01-28 Perforation 2467.30 2468.30 18
2019-01-28 Multi-Stage Fracture 2467.30 2468.30 0
2019-01-28 Perforation 2348.70 2349.70 20
2019-01-28 Multi-Stage Fracture 2348.70 2349.70 0
2019-01-28 Perforation 2257.90 2258.90 20
2019-01-28 Multi-Stage Fracture 2257.90 2258.90 0
2017-08-11 Multi-Stage Fracture 4453.20 4453.30 0
2017-08-12 Multi-Stage Fracture 4393.60 4393.70 0
2017-08-12 Multi-Stage Fracture 4333.90 4334.00 0
2017-08-12 Multi-Stage Fracture 4275.10 4275.20 0
2017-08-12 Multi-Stage Fracture 4215.40 4215.50 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-01-26 2019-01-28 2,138 0 N/A
2 2017-08-11 2017-09-03 2,138 1,295 N/A
3 2017-08-11 2019-01-28 2,138 3,607 N/A
4 2017-09-02 2017-09-03 2,138 0 N/A
5 2017-08-11 2017-08-13 2,138 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 hydrochloric acid 7647-01-0 100 17.9421 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0062 N/A
dibromoacetonitrile 3252-43-5 100 0.0062 N/A
non-hazardous ingredients Not Available 100 0.0062 N/A
polyethylene glycol 25322-68-3 100 0.0062 N/A
sodium bromide 7647-15-6 100 0.0062 N/A
pH- 2 Trican Buffer acetic acid 64-19-7 100 3.7597 N/A
water Not Available 100 3.7597 N/A
CC-10 Trican Clay Control non-hazardous ingredients Not Available 100 0.0172 N/A
AI-11 Trican Corrosion Inhibitor non-hazardous ingredients Not Available 100 0.0414 N/A
potassium iodide 7681-11-0 100 0.0414 N/A
propargyl alcohol 107-19-7 100 0.0414 N/A
propargyl alcohol derivative 9393 100 0.0414 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0422 N/A
propylene glycol 57-55-6 100 0.0422 N/A
FR-1s Trican Friction Reducer non-hazardous ingredients Not Available 100 0.0775 N/A
IC-3 Trican Iron Control sodium nitrilo-triacetate. monohydrate 18662-53-8 100 0.0828 N/A
SI-10 Scale Inhibitor Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0486 N/A
ASA-31 Trican Surfactant amines. tallow alkyl. ethoxylated 61791-26-2 100 0.2286 N/A
dipropylene glycol monomethyl ether 34590-94-8 100 0.2286 N/A
isopropanol 67-63-0 100 0.2286 N/A
quat. ammonium compounds. dicoco alkyldimethyl. chorides 61789-77-3 100 0.2286 N/A
2 Refer to MSDS 9211 100 36.3803 N/A
Water 7732-18-5 100 36.3803 N/A
CAN-1998 Water Soluble Acid Neutralizer / Buffer Canyon Technical Services Buffer No specific ingredients Not Available 100 0.004 N/A
CAN-1912 Clay Stabilizer (HT) Canyon Technical Services Clay Control No hazardous ingredients Not Available 100 0.0332 N/A
CAN-1200 Anti-Sludge Agent / Non-Emulsifier Canyon Technical Services Demulsifier Refer to MSDS 8251 100 0.296 N/A
CAN-2054 Friction Reducer (Acid) on the fly Canyon Technical Services Gelling Agent No specific ingredients Not Available 100 0.0759 N/A
CAN-2057 Friction Reducer Canyon Technical Services Gelling Agent No hazardous ingredients Not Available 100 0.047 N/A
CAN-1101 Iron Control Reduction Canyon Technical Services Iron Control 2-Mercaptoethanol 60-24-2 100 0.0796 N/A
Cupric Chloride 7447-39-4 100 0.0796 N/A
Monoethanolamine 141-43-5 100 0.0796 N/A
SI-10 Scale Inhibitor Canyon Technical Services Scale Inhibitor non-hazardous ingredients Not Available 100 0.0723 N/A
CAN-1202 Acid Wetting Agent Canyon Technical Services Surfactant 1-Methoxy-2-Propanol 107-98-2 100 0.0664 N/A
Water 7732-18-5 100 0.0664 N/A
3 Water Not Available 100 57.5396 N/A
4 AQUCAR DB20 Biocide Canyon Technical Services Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0084 N/A
2-mercaptoethanol 60-24-2 100 0.0084 N/A
dibromoacetonitrile 3252-43-5 100 0.0084 N/A
non-hazardous ingredients Not Available 100 0.0084 N/A
sodium bromide 7647-15-6 100 0.0084 N/A
5 CAN-4000 Tubular Lubricant Canyon Technical Services Friction Reducer Sorbitan Triolate 26266-58-0 100 0.0108 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-07-08 2017-09-03 Municipal Water 703
2017-07-07 2017-09-03 Central Water Distribution Facility 2202
2017-07-10 2017-07-15 Central Water Distribution Facility 1563
2019-01-16 2019-01-31 Oilfield Produced Water 70
2019-01-24 2019-01-24 Central Water Distribution Facility 28
2019-01-23 2019-01-24 Central Water Distribution Facility 343
2019-01-23 2019-01-23 Municipal Water 66
2019-01-23 2019-01-25 Municipal Water 471
2019-01-18 2019-01-25 Municipal Water 456
2019-01-23 2019-01-23 Municipal Water 124

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 1933 0.0 0.0 0.0
2018 7449 0.0 0.0 0.0
2019 8186 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-04-17 No Incident Encountered 0.00 0.00
2017-09-09 No Incident Encountered 0.00 0.00
2019-02-08 No Incident Encountered 0.00 0.00

For data sources see[9]

References