X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304240806000

Well Details

Well ID: 0304240806000
Loading map...
Location: 00/06-08-030-24W4/0
Location Alias: 00/06-08-30-24 W4M
Location Alias 2: 00/06-08-030-24 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 24
Section: 08
County/Municipality: Kneehill County
Well Name: DORSET PETROMK TECK SWAL 6-8-30-24
Operator Name: Baytex Energy Ltd.
License Number: 0053276
License Date: 1975-03-12
License Status: Abandoned
Spud Date: 1975-11-04
Final Drill Date: 1975-11-12
Well Total Depth: 1748.60 m
Surface Hole Latitude: 51.551057
Surface Hole Longitude: -113.350451

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-03-12 Obtained License
1975-11-12 Finished Drilling
1975-11-12 Well Mode changed to Drilled and Cased
1975-11-14 Production Casing Operation Performed
1975-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-12-04 Perforation Treatment Performed - Selective Jet Perforations
1975-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-02-02 Well Began Production
1976-02-02 Well Fluid changed to Crude Oil
1976-02-02 Well Mode changed to Pumping
1976-12-01 Well Fluid changed to Crude Oil
1976-12-01 Well Mode changed to Suspended
1998-12-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-12-01 Plug Back Performed
1998-12-02 Perforation Treatment Performed - Jet Perforation
1998-12-02 Perforation Treatment Performed - Remedial Casing
1998-12-02 Plug Back Performed
1998-12-03 Well Abandoned
1998-12-03 Well Fluid changed to Crude Oil
1998-12-03 Well Mode changed to Abandoned
1998-12-12 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-12-04 Selective Jet Perforations 1695.60 1695.90 0
1975-12-05 Acid Treatment 1695.60 1731.60 0
1998-12-01 Packing Device Capped w/Cement 1677.00 1685.00 0
1998-12-02 Perforation 319.00 319.30 11
1998-12-02 Remedial Casing Cementing 319.00 319.30 0
1975-12-04 Selective Jet Perforations 1697.10 1697.40 0
1975-12-04 Selective Jet Perforations 1697.70 1699.90 0
1975-12-04 Selective Jet Perforations 1702.90 1703.20 0
1975-12-04 Selective Jet Perforations 1716.00 1718.80 0
1975-12-04 Selective Jet Perforations 1719.70 1720.60 0
1975-12-04 Selective Jet Perforations 1726.70 1728.80 0
1975-12-04 Selective Jet Perforations 1730.30 1731.60 0
1975-12-04 Acid Treatment 1695.60 1731.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 5288 0.0 0.0 0.0

For data sources see[5]

References