X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304223115002

Well Details

Well ID: 0304223115002
Loading map...
Location: 00/15-31-030-22W4/2
Location Alias: 00/15-31-30-22 W4M
Location Alias 2: 00/15-31-030-22 W4/02
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 22
Section: 31
County/Municipality: Kneehill County
Well Name: COMPTON ET AL GPINE 15-31-30-22
Operator Name: Lexin Resources Ltd.
License Number: 0398894
License Date: 2008-07-24
License Status: Issued
Spud Date: 2008-08-05
Final Drill Date: 2008-08-06
Well Total Depth: 769.00 m
Surface Hole Latitude: 51.618313
Surface Hole Longitude: -113.082281

For data sources see[1][2]

Well History

Date Event
2008-07-24 Obtained License
2008-08-05 Surface Casing Operation Performed
2008-08-06 Direction Drilling Operation Performed - Deviate
2008-08-06 Finished Drilling
2008-08-06 Well Mode changed to Drilled and Cased
2008-08-07 Production Casing Operation Performed
2008-08-07 Rig Released
2008-08-19 Well Log Performed
2008-09-19 Perforation Treatment Performed - Jet Perforation
2008-09-30 Perforation Treatment Performed - Fractured
2008-10-07 Perforation Treatment Performed - Jet Perforation
2008-10-09 Perforation Treatment Performed - Fractured
2008-11-28 Well Structure changed to Commingled

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-08-06 137.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-09-19 Perforation 727.00 729.00 13
2008-10-07 Perforation 331.30 331.80 13
2008-10-07 Perforation 326.40 327.40 7
2008-10-07 Perforation 315.00 316.50 7
2008-10-07 Perforation 312.50 313.50 7
2008-10-07 Perforation 301.50 302.50 7
2008-10-07 Perforation 294.30 294.80 13
2008-10-07 Perforation 292.80 293.30 13
2008-10-07 Perforation 290.00 290.50 13
2008-10-09 Fracture 415.10 415.60 0
2008-10-09 Fracture 402.90 403.40 0
2008-09-19 Perforation 721.50 723.50 13
2008-10-09 Fracture 326.40 375.10 0
2008-10-09 Fracture 315.00 316.50 0
2008-10-09 Fracture 312.50 313.50 0
2008-10-09 Fracture 290.00 302.50 0
2008-09-30 Fracture 727.00 729.00 0
2008-09-30 Fracture 721.50 723.50 0
2008-10-07 Perforation 415.10 415.60 13
2008-10-07 Perforation 402.90 403.40 13
2008-10-07 Perforation 374.60 375.10 13
2008-10-07 Perforation 341.10 341.60 13
2008-10-07 Perforation 333.30 333.80 13

For data sources see[5]



References