X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304211906000

Well Details

Well ID: 0304211906000
Loading map...
Location: 00/06-19-030-21W4/0
Location Alias: 00/06-19-30-21 W4M
Location Alias 2: 00/06-19-030-21 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 21
Section: 19
County/Municipality: Kneehill County
Well Name: PINE CLIFF GPINE 6-19-30-21
Operator Name: Pine Cliff Energy Ltd.
License Number: 0402030
License Date: 2008-10-09
License Status: Issued
Spud Date: 2008-11-06
Final Drill Date: 2008-11-07
Well Total Depth: 685.00 m
Surface Hole Latitude: 51.582861
Surface Hole Longitude: -112.952035

For data sources see[1][2]

Well History

Date Event
2008-10-09 Obtained License
2008-11-07 Finished Drilling
2008-11-07 Production Casing Operation Performed
2008-11-07 Rig Released
2008-11-07 Well Mode changed to Drilled and Cased
2008-11-18 Well Log Performed
2008-12-06 Perforation Treatment Performed - Jet Perforation
2008-12-06 Well Log Performed
2009-12-01 Well Began Production
2009-12-01 Well Fluid changed to Gas
2009-12-01 Well Mode changed to Flowing
2010-06-22 Well Fluid changed to Gas
2010-06-22 Well Mode changed to Pumping
2011-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-11-04 Plug Back Performed
2011-11-04 Well Fluid changed to Gas
2011-11-04 Well Mode changed to Abandoned Zone
2011-11-14 Perforation Treatment Performed - Jet Perforation
2011-12-20 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-12-06 Perforation 439.00 441.00 17
2011-11-14 Perforation 249.50 250.50 13
2011-11-14 Perforation 239.00 240.00 13
2011-11-14 Perforation 236.50 237.10 13
2011-11-14 Perforation 225.00 226.00 13
2011-11-14 Perforation 222.50 223.50 13
2011-11-14 Perforation 215.00 215.50 13
2011-11-14 Perforation 203.50 204.00 13
2011-12-20 Fracture 203.50 377.80 0
2008-12-06 Perforation 517.00 520.00 17
2011-11-04 Packing Device Capped w/Cement 422.00 430.00 0
2011-11-14 Perforation 377.00 377.80 13
2011-11-14 Perforation 347.70 348.50 13
2011-11-14 Perforation 327.00 327.80 13
2011-11-14 Perforation 268.00 269.00 13
2011-11-14 Perforation 266.00 267.00 13
2011-11-14 Perforation 254.00 257.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 720 0.0 0.0 0.0
2010 3839 0.0 0.0 0.0

For data sources see[5]

References